网站大量收购独家精品文档,联系QQ:2885784924

2009公路监理工程师考试真题:道路与桥梁真题(国外英语资料).doc

2009公路监理工程师考试真题:道路与桥梁真题(国外英语资料).doc

  1. 1、本文档共31页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2009公路监理工程师考试真题:道路与桥梁真题(国外英语资料)

2009公路监理工程师考试真题:道路与桥梁真题(国外英文资料) The 2009 highway supervision engineer exam: road and bridge The first link of highway project construction quality supervision program is (). A. the contractor checked himself B. contractor fill in notice of quality acceptance notice C. contractor to fill in the application form D. check the first entry materials In the general subcontract, the act of breach of contract shall be deemed to be a breach of contract when the subcontractor has a breach of contract. Supervisory engineer B. the owner contractor subcontractor The supervising engineer is (). A. the owners behalf B. independent third party A spokesperson for the contractor D. the executor of government The final manifestation of the interests of the parties involved in any contract form is (). Project quality Project schedule Contract documents Project cost From the point of view of total quality management, the quality of the project depends mainly on (). Quality of work B. enterprise management level The quality of the enterprise D. process control Ability to reflect the progress plan of the construction process in the construction process (). Transverse chart Diagonal diagram C.S curve Network diagram There are many factors influencing the progress control of the construction site, which is considered to be the most influential factor (). A. money B. technology C. the artificial D. the equipment The supervision engineer shall () when he finds unqualified construction materials at the scene. A. Use at A discount, and lower the unit price B. Put it in place and stop using it C. stop using and order the contractor to be removed from the scene In situ destruction 9. Supervision engineer after receiving the contractors take cover engineering inspection application, proof of quality data review in the first place, and within the time stipulated in the contract to the on-site inspection, at this point, the () should be along with to the scene. A. the design unit represents B. proje

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档