管廊脚手架搭设方案(沙特)

HADEED DR MODULE D DEBOTTLENECKING (DBN) PROJECT THE METHOD STATEMENT OF SCAFFOLD FOR PIPE RACK ELECO-11071-DBN-TJ-FA- A 2 Dec 2013 ISSUED FOR REVIEW REV DATE DESCRIPTION PREPD (ELECO) CHKD (ELECO) APPD (ELECO) WISON Content 1. Introduction 3 2. Scope of Work 3 3. Manage Guidelines 3 4. Applicable Regulations and Standards 4 5. Man Power and Materials Supply 4 6. Scaffolding Material Standards 5 7. General Erection Methods 5 8. Special Erection Methods for Pipe Rack (New PR included) 7 9 Inspection 20 10 Scaffold tagging system 21 11 Modifications 21 12 Hazar