67-广东国华惠州大亚湾热电一期2_330MW机组工程(国外英文资料).doc

67-广东国华惠州大亚湾热电一期2_330MW机组工程(国外英文资料).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
67-广东国华惠州大亚湾热电一期2_330MW机组工程(国外英文资料)

67-广东国华惠州大亚湾热电一期2_330MW机组工程(国外英文资料) Guangdong Guohua Huizhou Dayawan thermoelectric 2 * 330MW unit project Cable tender notice Bid No.: WEME-0810-GHHZ-167~172 China Water Power Materials Co. Ltd. and Shenhua international trade limited liability company by the China Shenhua Energy Co of Hua Huizhou cogeneration branch company commissioned, for domestic public tender project for cable, welcome interested and qualified bidders. 1, tender: China Shenhua Energy Co Guohua Huizhou cogeneration branch, Guangdong Power Engineering Corporation, Tianjin electric power construction company, China Railway eighteen Bureau Group Second Engineering Company Limited Bidding agency: China water conservancy and electric power material Co. Ltd., Shenhua international trade limited liability company 2, the content of the tender: (1) the project name: Guangdong Guohua Huizhou Dayawan thermoelectric phase 2 * 330MW unit project. (2) sources of funds: the China Shenhua Energy Co investment, capital accounted for 25% of the total project investment, the remaining funds from bank loans. (3) construction site: Huizhou Guohua Dayawan power plant 2 * 330MW units in K1 block, located in Dayawan petrochemical zone at the eastern sea, the north of K1 600m in the construction of Huizhou LNG power plant, northwest of 1200m in Shell Petrochemical Company land, west of 1600m has been built in China Offshore Oil Corporation, the South China Sea petrochemical pier. (4) overview of the project: this project is a new project of cogeneration, forecast according to site conditions and heat load demand, power plant planning capacity is 4 * 330MW, the construction scale of 2 * 330MW sub critical parameters for cogeneration units. This project is planned to start in March 2008, put into operation in August 2009 1 units, 2 units put into operation in October 2009. (5): domestic public tender bidding (6) the scope and requirements Serial number Tender. Delivery schedule Tender fee (yuan) Bidder qualification req

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档