甲基丙烯酸的开车方案(国外英文资料).docVIP

甲基丙烯酸的开车方案(国外英文资料).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
甲基丙烯酸的开车方案(国外英文资料)

甲基丙烯酸的开车方案(国外英文资料) At the same time, open the C220 tower bottom valve LV2202 will go through the methanol water solution E-310 (C-220 MOH 2201-65, vice line M1B - LV2202 - MOH 2202-65 M1B, MOH 2203-65 M1B, MOH 3105-65 M1B-PP, MOH 3106-65 M1B, V-320 V320) directly into the tank, gradually establish hexane and methanol aqueous solution interface; At this point, the instrument personnel must be in place in time, as soon as possible to adjust the good system, and use. (2) the establishment of C-230, liquid level tower and reflux tank: P-221 activated by V231 to start line into the hexane reflux tank V-231 to establish a certain level, P232 will start C-230 reflux pump hexane into the C-230 tower, built the tower bottom liquid level; (3) the liquid level of C-240 tower and reflux tank is established: firstly, the purchased MMA is pumped into the tank and measuring tank, and then the MMA is pressed to the reflux tank V241 of C-240 tower with nitrogen to establish the liquid level. Start the C-240 reflux pump P242A/B, MMA the C-240 in the reflux tank into the inhibitor tank, and put the inhibitor powder into the V261. After stirring, the preparation is finished and then into the lower layer of the inhibitor tank; MMA into the C-240 tower, the establishment of tower tank level, at the same time, start metering pump P-261, will be equipped with a good inhibitor liquid into the C-240 tower at the top of the reflux pipeline, the tower, column internals and reflux pipeline infiltration. (4) level establishment of C-250 tower and reflux tank: through the unqualified material pipeline, use nitrogen to press the MMA in the metering tank to the backflow tank V-251 of C-250 tower, and establish the liquid level; Start the C-250 reflux pump P253, drive the MMA in the reflux tank V-251 into the inhibitor tank, and put the inhibitor powder into the V-262. After mixing, it can be sent into the lower layer of the inhibitor tank; V-251 into the C-250 tower MMA, the establishment of tower

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档