- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
新职业英语 建英语 Unit 1
;;Task 1; The following is a flow chart of the feasibility study of a construction project. Fill in the missing words according to the Chinese meanings. The first letters are already given.;Task 2 Look at the figure and then put the following items in order.
;Reading A;Background Information
可行性研究报告
建筑工程可行性研究报告通常包括项目总述和背景、项目的市场预测和分析、选址、总体设计方案、设备和物资采购、财务估算、经济评价、结论和建议等。;Reading A; The Costs in a Feasibility Study; 可行性报告中的费用
可行性报告是对项目的所有成本和总收入所做的财务分析,用于判断一个项目是否可以盈利。完成一份可行性报告一般需要经过几个阶段。第一阶段是利用当时已有的大致数据,而后面的阶段是当各项成本数据都最终确定以后进行。
; When preparing a feasibility study for a new construction project, the first point is likely to be the cost and availability of the land on which you propose to build. The tender, that is, the offer you make for the land, will also have a number of associated costs for items such as legal charges, stamp duty and utility charges, including transportation costs. There may be many other costs that will have to be considered.; 当为一个新的建筑项目准备可行性报告时,首先要考虑可能是能否取得该项目用地以及用地费用。投标价格,即为获得土地开出的价格,也包含其他相关费用,如法律费用、印花税和公共事业收费,如交通费等。另外可能还有其他费用需要考虑在内。
; A further estimate will be required of the fees and associated costs for the building design. Bids from a number of architects will have been collected and the most cost-effective design selected. All these estimated costs must be added to the first stage of the feasibility report.; 还要进一步估算建筑设计费及相关成本。可以从一些建筑师的投标中选择出最经济的方案。这些估算的费用都要加入到第一阶段的成本计算中。
; The next major aspect to consider will be the construction costs. For example, if your project comprises ten town homes, you need to calculate how much it will cost for building materials, wages and insurance. Contractors will be asked for estimates and the most reliable and cost effective design selected, but it is wise, at this stage, to include an extra percentage, say 10%, for non-specified costs.; 下一步主要考虑的方面是施工费用。例如,如果项目是要建十栋市内住宅,则需要计算需要花费多少钱来购买建筑材料、发放工资、支付保险费用。承包商需要对此进行估算,而最可靠最合算的方案将入选。要注意的
文档评论(0)