基坑维护设计和环境保护措施 - ctbuh - Council on Tall Buildings and ....PDFVIP

  • 8
  • 0
  • 约5.38万字
  • 约 13页
  • 2017-06-18 发布于天津
  • 举报

基坑维护设计和环境保护措施 - ctbuh - Council on Tall Buildings and ....PDF

基坑维护设计和环境保护措施 - ctbuh - Council on Tall Buildings and ...

ctbuh.org/papers Title: Design and Environmental Protection Measures During Excavation Authors: Qiping Weng, East China Architectural Design and Research R.B. Liu, East China Architectural Design and Research Weidong Wang, East China Architectural Design and Research Z.H. Wu, East China Architectural Design and Research ubjects: Building Case tudy Geotechnic/ Foundation Publication Date: 2014 Original Publication: uzhou Zhongnan Center: In Detail Paper Type: 1. Book chapter/ Part chapter 2. Journal paper 3. Conference proceeding 4. Unpublished conference paper 5. Magazine article 6. Unpublished © Council on Tall Buildings and Urban Habitat / Qiping Weng; R.B. Liu; Weidong Wang; Z.H. Wu Design and Environmental Protection Measures During Excavation 基坑维护设计和环境保护措施 Qiping Weng, R.B. Liu, Weidong Wang Z.H. Wu, East China Architectural Design Research Institute Co., Ltd. 翁其平, 刘若彪, 王卫东 吴治厚, 华东建筑设计研究总院 The total foundation pit area of the Suzhou Zhongnan Center is 26,260 square meters and is divided into two areas: one area consists of five underground floors and the other has two underground floors. The foundation pit depth ranges from 13.1 to 32.3 meters. This chapter discusses the engineering design of the foundation pit and protection measures for Suzhou Center, adjacent to the southeast, and the metro line 1 tunnel to the north. The five underground floors adopt the design scheme of a podium building top-down construction method in the first order, and the tower-building bott

文档评论(0)

1亿VIP精品文档

相关文档