- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
供油提早角的检查与调剂(国外英语资料)
供油提前角的检查与调整
Intellectual, zizhizhe ming. The waves between the river and the sky surge into the wind and the earth. Xiaolou night listening to the storm, energy-saving. Truthfulness east side, always a riot of colour of spring. Anteriormo Chou no friends, everyone knows you in the world. Inspection and adjustment of fuel supply advance angle
Source: kuny group published: 2010-2-6 has been viewed 496 times
--------------------------------------------------------------------------------
Characteristics of timing inaccuracy of diesel engine oil supply
First, the oil supply time is too early. The diesel engine is not easy to start, the crankshaft is easy to reverse, and in the work, the cylinder will produce a sharp knock, and even cause early wear of the parts, power reduction, idle bad. When judged by low speed to high speed, rapid increase of accelerator pedal test, such as the accelerator pedal more urgent, increase the more serious abnormal sound, speed increased after noise reduced or disappeared, quickly recover the accelerator pedal when the sound disappears, and the sound speed is reduced after recovery, for the fuel injection time too early;
Two is the oil delivery time too late. Easy to cause the cooling water tank, engine overheat boiling, diesel consumption increased; with the increase of the accelerator pedal speed cannot be increased quickly, the exhaust white smoke, economy and power, in case of the above phenomenon can be determined for the time too late.
Inspection of fuel advance angle
The first fuel injection pump cylinder high-pressure tubing removed, the engine decompression decompression to handle position, fuel injection pump at maximum throttle position, to the exclusion of diesel in the pipeline air supply system, so that it is full of diesel. Turn the crankshaft so that the first cylinder piston is at the compression TDC (both inlet and exhaust doors are closed), at this time the mark on the flywheel or pulley shall be aligned to the mark on
您可能关注的文档
- 东财10秋学期《高级财务会计》在线作业二(国外英语资料).doc
- 东财11春学期《施工技术》在线作业(随机)6(国外英语资料).doc
- 东财11春学期《论文写作指导》在线作业一(随机)答案(国外英语资料).doc
- 东财《经济学B》在线作业三(国外英语资料).doc
- 丝印技术(国外英语资料).doc
- 丝网常用术语(国外英语资料).doc
- 丝印中网版的绷网技术(国外英语资料).doc
- 丝网印刷中的绷网参数(国外英语资料).doc
- 东财11秋《经济学B》在线作业三(国外英语资料).doc
- 两个做环评的要结婚(搞笑版)(国外英语资料).doc
- 2-红河州建筑施工安全生产标准化工地复核评分表(2022年修改版).docx
- 6.锡通项目2018年下半年工作会汇报材料(2018.7.9).docx
- 2018道路工程知识点汇总(新版).docx
- 附件3:月度生产例会安全汇报资料-站台门项目部.docx
- 附件2:广东建工集团2018年度科技成果汇总表.DOC
- 马武停车区、三汇停车区停车位管理系统,0#台账缺量.doc
- 攀成钢委办发〔2015〕19号(党风廉政建设责任考核与追究办法).doc
- 1-红河州建筑工程质量管理标准化复核评分表(2022年修改版).docx
- 中交第三公路工程局第四工程分公司项目经济合同结算管理办法(修订).doc
- 厂站安全操作规程汇编.doc
文档评论(0)