9号、12号单开道岔检查(国外英语资料).doc

9号、12号单开道岔检查(国外英语资料).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
9号、12号单开道岔检查(国外英语资料)

9号、12号单开道岔检查(国外英语资料) Ordinary single-opening bifurcation check First, prepare for work 1, fill in the name of the check record book in advance, the number of the branch, the type of the switch and the inspection date and the inspection person. 2, confirmed that ruler, offset ruler whether in the metrological department appraisal period, such as not qualified period to/report, after the consent, just can use. The track gauge is marked on the track 35, and the gauge length of the gauge with steel tape measure is greater than plus or minus 1mm. Adjust when deviation is allowed. Second, basic homework Set up protection, report the assessor, and do the homework. To stand and look at the rails of the straight off-line of the branch at about 30 to 50 meters from the end of the tunnel. Horizontal visual-vision. If the tracks are found to be either low or low, it can be recorded in track, low and other. After 3, visual rails to high and low, return to check first (tongue rail slope before the finish line, the rail before tapping, positive and negative rail gauge whether their level of error correction is greater than + / - 1 mm, error is more than + / - 1 mm, adjusted). Step 4: check and record according to the sequence of the gauge and the back level. When examining the gauge, it is greater than 1435mm for +, less than 1435mm -. Outside inspection level, keep stocks: as a standard shares, song: outside (on the shares) as the standard shares, standard high for +, instead of -. (1) the first place: the end of the slope. Within 100mm range of the base rail front end. (2) the second place: the cusp. It is 50 to 100mm from the tip of the tip. (here the gauge is 43, 50-9 bifurcated to 15mm, or 1450mm; 443, 10mm, 10mm, 1445mm). (3) the third place: the spigot. In tongue rail plane cut end point, that is, with the part of the gauge widening (gauge widening here 43, 50-9 of 9 mm or 1444 mm; 43, 50-12 to 7 mm or 1442 mm) here do not check, check the gauge track gauge will be quickly

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档