- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
anchai(国外英文)
anchai(国外英文资料)
Special construction plan for tower crane demolition
First, tower crane settings
1, according to the actual situation of the project, set up a tower crane, the model is QTZ-40, located on the west side of the project.
2, the basic bearing capacity is greater than 200KN/m2, the depth of reinforcement is greater than 1.3 meters, and the error of the four anchor columns on the basis of slope and flatness is less than 1/500 (the level of the top of the foundation is less than 1/500).
3, tower crane power distribution box independently set, and set at 5 meters away from the tower.
4 、 the ground has been cleared and the barrier has been formed.
Two tower crane safety demolition
(1) allocation of resources
1, configure 12T car crane 1, and all kinds of slings, slings.
2, personnel allocation: Command 1, tower crane driver 1, electrician 1, installation personnel several.
(two) assemble
1. Lift the first section in the middle of the four anchor columns, the standard section has stepped side in and out of the surface, and should be vertical to the building.
2, the second section of the standard section installed in the first section of the standard section, pay attention to the foot should be aligned up and down.
3. Assemble the rack. The surface of the cylinder on the jacket shall be aligned with the standard section with the stepped surface, and the climbing claws on the rack are placed on the bottom step of the base section.
4. Assemble the upper and lower supports, slewing mechanisms, slewing bearings, platforms and so on. Then, they are installed on the sleeve and are firmly connected.
5. The tower cap is connected with the upper support by the pin shaft, and the inclined plane of the tower cap is on the same side as the suspension arm.
6. The lifting balance arm is connected with the upper support by the pin shaft, and a counterweight of the 2T is hoisted at the third position forward from the tail of the stationary arm.
7. Hoist the cab and switch on