低温施工(外国英语资料)
低温施工
The concrete construction measures of low temperature of this post has been viewed 1118 times | reply 1 times
Enclosure:
Concrete construction and overwintering protection measures of lower section of spillway in low temperature season
I. brief introduction:
The Nilki water control project is located in the middle reaches of Nenjiang river at the junction of Heilongjiang province and the Inner Mongolia Autonomous Region province. It is located in the north cold temperate zone. It belongs to the cold temperate monsoon climate zone. It is cold and dry in winter and lasts for half a year. T