中国水利工程总承包交易模式创新与关键科学问题丁继勇1,王卓甫1.DOC

中国水利工程总承包交易模式创新与关键科学问题丁继勇1,王卓甫1.DOC

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国水利工程总承包交易模式创新与关键科学问题丁继勇1,王卓甫1

中国水利工程总承包交易模式创新与关键科学问题 丁继勇1, 王卓甫( (河海大学 工程管理研究所,南京 211100) 摘 要关键词Transaction mode innovation and key scientific issues for engineering general contracting in water conservancy projects in China DING Jiyong1, WANG Zhuofu1, LING Yangmingxing1, REN Xiaoqiang2 (1. Institute of Engineering Management, Hohai University, Nanjing 211100, China; 2. Power China ZhongNan Engineering Corporation, Changsha 410014, China) Abstract: Influenced by international contract conditions such as the FIDIC, the engineering and theory circles in China often connect engineering general contracting with fixed price contract and its associated simple governance structure, which restricts the application and popularization of engineering general contracting in water conservancy construction projects with total or part government investment, as well as site data uncertainty. This paper points out that the biggest advantage of engineering general contracting is the integration of design and construction, and contract them out to a contractor, providing impetus, platform and space for the contractor to optimize the project, adding value to the project. Therefore, we need to be innovative to improve corresponding transaction mode, so as to adapt to the particularity of water conservancy projects, put value-added advantages into full play for water conservancy projects with general contracting. Based on the above viewpoint, this paper analyzes the status of engineering general contracting at home and abroad, refines the key scientific issues of water conservancy engineering general contracting mode innovation, mainly including: project identification and mode choice; project transaction value-added distribution; optimization design of governance system at owner and contract levels. Key words: water conservancy project; engineering general contracting; mode innovation; key scientific issue; value-added 1 引 言 DBB(Design-Bid-Build)方式,使工程设计方既没有条件,也没有动力去进行工程设计施工的整体优化,导致在一些水利建设项目上出现较为严重的实际投资超概算等浪费现象。

文档评论(0)

youbika + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档