后张法预应力混凝土T梁预制(国外英文资料).docVIP

  • 67
  • 0
  • 约2.23万字
  • 约 19页
  • 2017-07-05 发布于河南
  • 举报

后张法预应力混凝土T梁预制(国外英文资料).doc

后张法预应力混凝土T梁预制(国外英文资料)

后张法预应力混凝土T梁预制 Post tensioned prestressed concrete; T beam; precasting 2) construction plan Built in the main field of prefabricated KXX+XX left (right) side, a prefabricated at the JS750 concrete floor, precast pedestal beam adopt concrete fixed pedestal, the surface using terrazzo. Mobile prefabricated at the installation of 2 sets of 100 ton span is XX meters high XX meters for floor concrete transport and gantry crane components, beam forming with large steel factory, attached type vibrator based plug-in vibrator by using cover closed steam curing, prestressed two-way double control tensioning, grouting machine grouting. X set in beam template processing, X set of edge beam template, XX set up a pedestal. 3) personnel, materials, equipment and duration quota (1) personnel Serial number, quantity, remark 1 steel worker 36 2 welders 12 3 carpentry 15 4 concrete worker 25 5 mechanical operator 6 6 electrician 3 7 50 (2) machinery Serial number, equipment name, unit type, quota, output quantity 1 steel formwork sleeve 4 2 concrete mixing building JS750 45m3/h 1 3 sets of 100 tons gantry crane 1 4 dump truck platform CG342 2 5 truck platform DF141 1 6 loading machine ZL50 1 7 attachment vibrators 3KW 126 8 insert vibrator 8 The 9 tensioning jack YCW250 2 Serial number, equipment name, unit type, quota, output quantity 10 oil pump station ZB4-500 2 11 pressure grouting machine 1 12 cement mixing machine table 1 13 grinding wheel cutting machine 1 14 electric welding machine table BX2-500 2 (3) duration quota; XX tablets per month 4) construction methods and process measures (1) entablement With the construction of reinforced concrete fixed pedestal, the table size and beam size matched, table 5cm using terrazzo concrete. The exposed edges with the triangle edge to prevent in the process of using the off angle, both sides of the pedestal for die hole and the beam to pull the wire rope groove. The top and sides must be smooth, in order to ensure the side mold installati

文档评论(0)

1亿VIP精品文档

相关文档