- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安全文明施工典型违章(171条)(国外英文资料)
安全文明施工典型违章(171条)
Safe and civilized construction typical violation
Serial number violation content memo
I. regulatory violations (30 articles)
1.. Issuing orders against the relevant safety production laws, regulations and rules and regulations, and conducting orders in violation of regulations
2. compel or acquiesce the operators to take risks in the case of inadequate safety protection measures
3., there is no approval of the units annual safety construction technical measures plan, can not ensure the extraction and use of safety technical measures funds
4., the cost of safety protection is insufficient, the quality of labor protection products is poor, and the safety of equipment is poor
5., the safety supervision departments or technical departments have issued a notice of the use of facilities, not to eliminate hidden dangers, unauthorized use
6. construction machinery and facilities have unsafe state or safety protection device is not perfect, in the absence of practical preventive measures to allow participation in the operation
7. organization, examination and approval of technical solutions or safety construction measures, or without technical, safety disclosure, organization starts
8., special major dangerous work, relevant leaders did not attend the command, not technology, safety supervision personnel supervision, supervision and management, operating personnel without special training.
9. according to the specified frequency of organizing or participating in safety inspection, or to identify issues according to the three (the responsibility set deadline, the measures implemented or supervise the implementation of the rectification principle)
10., not seriously examine the sub contractor safety technical measures program, not subcontracted units construction projects, safety construction, technical supervision and guidance
11. decide, change, dismantle, misappropriate or deactivate safety devices or safety facilities without approval
12. failed to adhere
您可能关注的文档
最近下载
- 人脸识别门禁.pdf VIP
- 单一制和复合制课件高中政治选择性必修一当代国际政治与经济.pptx VIP
- 创新创业基础(高职高专版)PPT教学完整课件.ppt
- 老旧小区弱电方案和施工组织设计.docx VIP
- 数据脱敏处理与使用管理规则.docx VIP
- 和利时LE系列可编程控制器选型手册.pdf VIP
- 信息系统专职人员培训和考核制度.docx VIP
- 英语课程标准研究与教材分析(第2版)课件全套 第1--9章 英语课程标准和英语课程的基本概念 ---英语教材难度分析.pptx
- 烹饪概论课件.ppt VIP
- 江苏凤凰少年儿童出版社小学四年级上册《书法练习指导》教学计划与教学设计.pdf VIP
文档评论(0)