斯伦贝谢petrel教程3.ppt

  1. 1、本文档共42页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
斯伦贝谢petrel教程3

Overview - Chapter 1 PETREL 2003 Isochore processing - Extra Structure grid-to-well tie Surface operations (2D grids) Surface operations Lecture and exercise purpose Purpose: Learn how to perform operations on surfaces and between surfaces. You will learn to: Manipulate a surface using Surface Operations Calculate azimuth and dip values from a surface Use the surface calculator Build rock gross thickness grids Calculate volume between surfaces Areal calculations Inside polygon For defined nodes in a grid Surface operations Surface Operations Contains tools for manipulating on existing surfaces Rotate and smooth Extrapolate Expand and shrink Flip values Shift values Merge surfaces Surface operations 2D Volume processing; General procedure Given top and base structure grids Incorporate fluid contacts into top and/or base grids Build gross rock thickness grid Discount gross rock thickness by N:G, Phi, and (1-Sw) Calculate volume for positive thickness Calculate area for positive thickness Volume processing (2D Grids) Top and base structure grids Should define the zone of interest Should not contain missing node values over area of interest No volumes for missing nodes Fault gaps should be filled with nodes Should be tied to the top picks Volume processing (2D Grids) Incorporate Fluid Contacts Volume processing (2D Grids) Build gross rock thickness grid 1. Open the Surface calculator (right click on a surface and select calculator) Volume processing (2D Grids) Petrophysical parameters Common petrophysical parameters are: Net-to-gross Porosity Water saturation (used as 1-Sw) Parameters represent average value for zone May be either constant or grid Z-range between 0.0 and 1.0 (ratio) If percent then divide by 100 If outside 0-1 range then clip Volume processing (2D Grids) Build hydrocarbon pore thickness Gross thickness * Net-to-gross = net thickness Net thickness * Porosity = pore thickness Pore thickness * (1 – Water saturation) = hydrocarbon pore thickness

文档评论(0)

dajuhyy + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档