基坑土钉墙支护施工工法(Foundation pit soil nail wall support construction method)
基坑土钉墙支护施工工法(Foundation pit soil nail wall support construction method)
Foundation pit soil nail wall support construction method
One, foreword
Foundation pit soil nail wall support is a new kind of retaining structure which has been developed in recent years for soil excavation and slope stability. Due to the
Its economy, construction fast and other advantages, in our country can rapidly promote the application. The so-called upper nail wall support is to reinforce and anchor
The slender rod (soil nailing) of the soil in situ in situ is used as the force member, with the reinforced orthotopic soil and shotcrete layer
A system of support.
In recent years, the soil nailing wall support has developed rapidly in our province, and has been used in the foundation pit support project for industrial and civil buildings.
In combination with other supporting methods, good results have been achieved, and significant social and economic benefits have been obtained.
2. Characteristics of soil nail wall support
1. Can rationally utilize the self-bearing capacity of the upper body, and use the upper body as an integral part of the supporting structure.
2. Light and flexible structure with good shock resistance and ductility.
3. The construction is convenient and safe, the making of soil nail is simple and easy to use, and it is flexible and convenient for the change of site monitoring
Shape data and special situation, change design in time.
4. The construction site should not be occupied separately. For the construction site is small, the slope is difficult, and there are adjacent buildings and large slope protection works
When the device cannot enter, the technology shows unique superiority.
5. Stable and reliable, small displacement of slope after supporting, horizontal displacement is usually 0.1% - 0.2%, the maximum not exceeding
Over 0.3 percent, the overload ability is strong.
6. The total period of work is short, which can be accompanied by excavation and support, which wil
您可能关注的文档
- 压型钢板(Pressed steel plate).doc
- 压实度试验检测(Test of compaction test).doc
- 压榨机器,Hack,设计极限强度的网络应用(Press machine, Hack, design limit strength network application).doc
- 压力容器何时进行无损检测以及无损检测方法的选择(The selection of nondestructive testing and nondestructive testing methods for pressure vessels).doc
- 压缩机培训教材(Compressor training materials).doc
- 压缩果汁的生产流程(The production process of compressed juice).doc
- 压缩机排气温度高(The compressor has high exhaust temperature).doc
- 压铸常见缺陷成因(Causes of common defects in die-casting).doc
- 原产地品牌认识和创建地理品牌的资产价值(下)(Origin brand recognize and create the asset values of geographic brands (below)).doc
- 原油、天然气长输管道与铁路相互关系的若干规定(Certain provisions of the relationship between oil and natural gas pipelines and railways).doc
文档评论(0)