基坑土钉墙支护施工工法(Foundation pit soil nail wall support construction method).doc

基坑土钉墙支护施工工法(Foundation pit soil nail wall support construction method).doc

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
基坑土钉墙支护施工工法(Foundation pit soil nail wall support construction method)

基坑土钉墙支护施工工法(Foundation pit soil nail wall support construction method) Foundation pit soil nail wall support construction method One, foreword Foundation pit soil nail wall support is a new kind of retaining structure which has been developed in recent years for soil excavation and slope stability. Due to the Its economy, construction fast and other advantages, in our country can rapidly promote the application. The so-called upper nail wall support is to reinforce and anchor The slender rod (soil nailing) of the soil in situ in situ is used as the force member, with the reinforced orthotopic soil and shotcrete layer A system of support. In recent years, the soil nailing wall support has developed rapidly in our province, and has been used in the foundation pit support project for industrial and civil buildings. In combination with other supporting methods, good results have been achieved, and significant social and economic benefits have been obtained. 2. Characteristics of soil nail wall support 1. Can rationally utilize the self-bearing capacity of the upper body, and use the upper body as an integral part of the supporting structure. 2. Light and flexible structure with good shock resistance and ductility. 3. The construction is convenient and safe, the making of soil nail is simple and easy to use, and it is flexible and convenient for the change of site monitoring Shape data and special situation, change design in time. 4. The construction site should not be occupied separately. For the construction site is small, the slope is difficult, and there are adjacent buildings and large slope protection works When the device cannot enter, the technology shows unique superiority. 5. Stable and reliable, small displacement of slope after supporting, horizontal displacement is usually 0.1% - 0.2%, the maximum not exceeding Over 0.3 percent, the overload ability is strong. 6. The total period of work is short, which can be accompanied by excavation and support, which wil

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档