- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第三章 接管验收综述(Chapter iii review of acceptance and acceptance)
第三章 接管验收综述(Chapter iii review of acceptance and acceptance)
This article is contributed by xixistella
Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view.
The third chapter
Overview of takeover acceptance
With the experience of years of service management, the property company shall re-examine the completed project from the perspective of use, management and maintenance. In the past, many experiences have proven that, although the project is largely completed and accepted, the quality problems remain in the acceptance stage, and some of the problems are quite serious. To ensure to take over the property in all kinds of construction projects and equipment system quality meet the national standards or industry standards, to achieve the objective of the takeover of a high quality property, property company shall, on the basis of relevant standards to take over the acceptance standard and working procedure, in accordance with the acceptance to take over. Process acceptance mainly refers to the construction process and the commissioning process and the final acceptance of the equipment system. Because the process of acceptance and acceptance of certain content basically the same, so this chapter will together, at the back of each major project acceptance for different test Closing phase reference, therefore no separate narrative acceptance process, and focuses on takeover of acceptance.
Section 1 conditions for acceptance of acceptance
First, the first condition of acceptance of the new property takeover acceptance is the completion acceptance, and the basic conditions for the acceptance of the takeover are as follows. Whether a property project is taken over or taken over in installments, it must meet the seven general and one level. Seven links means water, electricity, ventilation, heating, access, communication and television; A flat refers to the level of flat, unclut
您可能关注的文档
- 瓦检员考试复习题07(The wattage exam question 07).doc
- 瓦赫宁根大学生活全功略(Wageningen university is full of life).doc
- 瓷砖损耗算法(Tile loss algorithm).doc
- 瓦检员考试复习题01(The wattage exam question 01).doc
- 瓷砖的基本知识(Basic knowledge of tile).doc
- 瓦检员考试复习题09(The watcher was on problem 09).doc
- 理论模拟考(Theoretical simulation examination).doc
- 甜品做法(Dessert is).doc
- 生产汽车扰流板 材质要塑料(Make the material of the spoiler to be plastic).doc
- 生产部车间现场管理制度(Production department workshop site management system).doc
- 第二单元教材分析(Unit 2 textbook analysis).doc
- 第二章 气体分子运动论的基本概念(Chapter two basic concepts of kinetic theory of gases).doc
- 第1章 混凝土结构用材料的性能(Chapter 1. Properties of concrete structures used in materials).doc
- 第二章 单级平衡过程(Chapter ii process of single-stage equilibrium).doc
- 第二章 一日工作概述(Chapter ii summary of work).doc
- 第二章资金时间价值与风险报酬练习答案(Chapter ii the time value and the risk reward practice answer).doc
- 第二节 氧气的性质和用途(Section 2 properties and USES of oxygen).doc
- 第二篇 选择正确的方向(The second one chooses the right direction).doc
- 第二节生活饮用水水质卫生现状(Section 2 water quality and hygienic situation of drinking water).doc
- 第二部分 基本操作技能(第二单元 口腔基本技术)(Part ii basic operational skills (unit 2 basic oral technology)).doc
文档评论(0)