结构专业问题(Structural problems).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
结构专业问题(Structural problems)

结构专业问题(Structural problems) A list of common problems in structural science The common problem of serial number is related to the process of processing opinions Code number entry Load and calculation part When calculating the effect of a one-way earthquake, the effect of accidental eccentricity is not considered. 3.3.3 corrective JGJ3-2002 2. The basic air pressure of high-rise buildings which are particularly important or sensitive to wind load is not adopted in the wind pressure value of the 100 year recurrence period. 3.2.2 corrective JGJ3-2002 3 high-rise fire escape staircase, the load value is less than 3.5kn/m2. 4.4.1 rectification GB50009-2001 4. The roof of a persons house is still worth 1.5kn/m2 with the old standard, and it is confirmed to the non-human roofing. Sometimes the structure is designed according to the non-human roof, and the building is the roof of the person. 4.3.1 corrective GB50009-2001 5 pairs of hotel, hospital and other bathroom walls are partially arranged, and the equivalent load is not converted to the actual input, such as the value of the live load by 1/3 of the wall weight per meter is small, and is greater than or equal to 1.0 kn/m2. Gb50009-2001 4.1.1 injection 5 rectification The first self-oscillation period of the first self-oscillation period of the structure torsion is the ratio of the first self-oscillation period T1 to the first self - vibration period. The height of A is greater than 0.9, and the height of B is greater than 0.85. JGJ3-2002 4.3.5 rectification 7. The structure of the mass and stiffness distribution is obviously asymmetric and uneven, and it is still calculated according to the effect of one-way horizontal earthquake. 3.3.2 rainfall distribution on 10-12 corrective JGJ3-2002 8 V shape, Y shape, curved, well - shaped flat building, the wind load coefficient still takes 1.3. Jgj3-2002 3.2.5 audit opinion The stiffened increase coefficient of the girder in the cast-in-place floor is 1.0, causing the girder su

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档