能源基地土建工程临时用电施工方案(Temporary electricity construction scheme for civil engineering projects in energy base).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
能源基地土建工程临时用电施工方案(Temporary electricity construction scheme for civil engineering projects in energy base)
能源基地土建工程临时用电施工方案(Temporary electricity construction scheme for civil engineering projects in energy base)
Temporary electricity construction plan for the construction of an energy base
The article was published: 2009-11-27 23:54:37
Temporary electricity construction scheme for civil projects in aisikai energy base
Approval opinion:
Manager:
Planning division:
Technical department:
Security department:
Project manager:
Shi workers:
Director of unit engineering technology: li xiaochun (dandong)
Supervisor:
Aisi construction (nanjing) co. LTD
Aisikai energy base civil engineering project department
June 06, 2009
Orders to record
I. project overview
2. Preparation of the basis
Construction conditions
4. Determine the electrical arrangement
V. load calculation
6. Selection of transformer capacity, conductor and distributor type specification
7. Safety electricity measures
Viii. Electrical fire prevention measures
Nine, the appended drawings
Temporary electricity construction scheme for civil projects in aisikai energy base
I. project overview:
Dandong aisikai energy co., LTD. Energy base project construction/civil engineering, located at the left bank of east da donggou industrial park east of dandong industrial park and the right bank of the current power plant. The field is flat.
This project main construction contents include: gasoline and diesel tank group base, fire pool, pool accident, office building, boiler room, fire pump room and generator plant, petrol and diesel loading and unloading station, liquefied petroleum gas loading and unloading station, liquefied petroleum gas spherical tank group foundation engineering, road engineering, pipe rack etc more than ten items. The commencement date is 06.06.2009, completion period: 180 days.
2. Preparation of the basis
1. Design of construction organization of civil engineering project group of energy base
2. Site exploration data
3. Technical specification for temporary electrical power safety in construction site (jgj
您可能关注的文档
- 砌块墙体裂缝的通病及其防治(The common disease of masonry wall fracture and its prevention and cure).doc
- 砌筑复习资料(Masonry review materials).doc
- 砖混结构(Brick structure).doc
- 破解最新路考九道关 新手轻松拿驾照_凌风-自己来得更简单些!(To break the latest road test, the beginner will easily get a driver's license.).doc
- 砼裂缝的原因(Causes of concrete cracks).doc
- 砼裂缝处理.txt(Concrete crack treatment. TXT).doc
- 砼评定标准(Concrete evaluation standard).doc
- 硅整流焊机(Silicon rectifier welder).doc
- 硒鼓使用常识(Use common sense).doc
- 硕士学位申请书填写(Application form for master's degree).doc
最近下载
- 汉得微扬-西凤酒CRM项目投标建议方案 20170106.pptx VIP
- 信用证试题库及答案.doc VIP
- 汉得信息_陆家嘴商业地产项目_投标文件_V2.02.pptx
- 医疗器械体系文件-软件部署管理规定.doc VIP
- WPS Office2019办公应用教程课件 项目四 WPS文字的图文混排.pptx VIP
- 汉得信息_陆家嘴商业地产项目_投标文件_V0.03.pptx
- 国家税务总局就非居民企业间接转让中国财产的税务问题予以进一步明确.doc VIP
- 故事大全:科学家的故事_名人故事:名人科学家的故事.doc VIP
- 35kV开关柜安装施工方案.doc VIP
- 食材验收制度.docx VIP
文档评论(0)