议标流程(Negotiation process).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
议标流程(Negotiation process)

议标流程(Negotiation process) Construction project construction invite negotiation procedure procedure analysis The 2006-6-2 Construction project project report 1. The construction of the project approval documents of the project or annual investment plan issued, in accordance with relevant provisions of the to establish measures for the management of engineering construction projects have a condition, should be to establish to the construction administrative department for the record. 2. To establish construction project scope: all kinds of buildings (including building, rebuilding and expansion, rebuilding, repair, etc.), civil engineering (including: roads, Bridges, building foundation pile), equipment installation, pipe line installation, decoration construction, etc. 3. The construction project is to establish content mainly includes: name of the project, construction site, investment scale, capital source, investment, project size, structure type, contract mode, the construction of project commencement date, engineering, etc. 4. Documentation for the inspection of the project: 4.1 approval document or annual investment plan; 4.2 fixed asset investment permit; 4.3 construction project planning permit; 4.4 financial certificates. 5. Project application: Construction unit to fill in unified format to establish registration form engineering construction projects (attachment 1), there are subject to the approval of the competent department, after the newspaper should present the documents along with the construction administration department. * after construction project to establish for the record, with the engineering construction bidding and tendering management method stipulated in the conditions of the tender for the construction of the project, can begin to deal with the construction unit qualification examination. Ii. Examination and construction unit qualification 1. The construction unit shall meet the following conditions: 1.1 the legal person and other organ

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档