2012市冲刺题第一套(The first set of the 2012 sprint).docVIP

2012市冲刺题第一套(The first set of the 2012 sprint).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2012市冲刺题第一套(The first set of the 2012 sprint)

2012市冲刺题第一套(The first set of the 2012 sprint) One, a single choice question (20 questions, 1 point per problem). Only 1 of the candidates for each question is the most important. 1. The characteristic is the deflection under load, bending strength, small deformation, cumulative deformation under repeated load, the destruction of it depends on the limit of vertical deformation and bending tensile strain, the road is (). Rigid pavement Flexible pavement C. semi-rigid road surface Lower pavement The mix of asphalt mixtures made up of the principle of graded distribution, which consists of not including (). A. skeleton A solid structure B. the structure of the skeleton C. dense suspension structure D. frame a closed structure According to the solid coefficient of soil, the level of soil between 0.6 and 0.8 is (). Class A Type 2 soil Three kinds of soil tetris 4. According to the urban road construction and acceptance standard, the relevant provisions of the asphalt mixture surface shall not be in the rain and snow weather and environment construction when the highest temperature is lower than () ℃. 5 A. 10 B. 15 C. D. 20 The main load-carrying structure that spans obstacles when the line is broken is called (). Tapered protection Bridge structure C. support D. pier First, the prestressing force, the prestressed tendon and the isolation sleeve should be put in place after the steel frame is finished. After the position, it is strictly forbidden to use () to cut or weld the beams and steel plates. Flash butt welding B. resistance spot welding Electric arc welding D. Submerged arc pressure welding The form of soil, loess, and weathered rocks above ground water level is (). A. The mud walls are perforated The dry job is a hole C. the barrel of the tube is piled up Blast hole Where the ground traffic and environmental conditions permit, the method of construction of the subway shall be (). A. B C. spray anchor digs D For single-chamber box girders and girders, the choice ()

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档