仓库验收员(The warehouse receipt clerk).docVIP

仓库验收员(The warehouse receipt clerk).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
仓库验收员(The warehouse receipt clerk)

仓库验收员(The warehouse receipt clerk) Warehouse inspector Multiple choice 1. The general material shall be completed within () days, and large or special materials shall be completed within () days. A, 2, 5, B, 3, 7, C, 1, 6, D, 3, 6 2. The acceptance error of material quantity shall be measured by weight, and the error shall be allowed. The permission of length is the error of (). A, 2 ‰ 1 ‰ B, 3 ‰ 2 ‰ C, 3 ‰ 1 ‰ D, 1 ‰ 2 ‰ The special circumstances may take sampling inspection, and the sample number is generally carried out according to the amount of goods delivered. A, full inspection of 10%b, sampling 15% C, full test 15% D, sampling 10% 4. If the goods are not delivered to the warehouse, they should be listed as () A. In-transit materials B 5. The quantity of materials shall be found to be short in quantity when the goods are delivered to the goods, such as within the scope of the national regulations (). A, short B, qualified C, unqualified 6. The metering method of material distribution is consistent with the measurement method of incoming goods. A, it must be B, not C, not necessarily 7. There is a reusable material in stock, and the warehouse shall be distributed according to the principle of (). A, first use the old, then use the new B, first use the new, then use old C, old and new 8. When physical and chemical tests are required to examine physical and chemical properties of materials, they shall be tested and measured by technology. A, the department of the department of inspection B, the professional inspection department The delivery of the goods, the certificate is not complete, in principle not acceptance, should be treated as (). A. In-transit materials B 10. The emergency treatment method for sparse leakage is () A, clear B, water or sand cover C and sand The minimum temperature is called () when the flash burns. A, B, flash point 12. The burning point of paper for common items is (). A, 100 ℃, 130 ℃, 150 ℃ C B 13. When the quantity is not in conform

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档