仪器验收注意事项(Matters of acceptance of instruments).docVIP

仪器验收注意事项(Matters of acceptance of instruments).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
仪器验收注意事项(Matters of acceptance of instruments)

仪器验收注意事项(Matters of acceptance of instruments) Note to the inspection of the goods and parts of the instrument: 1. The instrument out of the work must be done by the engineer, the many users are all know, the key is if it is found that the packing have any abnormal situation, such as the packing is not complete, damage or untidy and so on, had better have a third party present, such as the customs officers. 2. Always remember to take photographs - this is often the most easily overlooked, found abnormal packing or unpacking found damage or other abnormal parts, with our first digital camera to record the real situation, and then to other actions. Especially the imported instruments, the foreigner to identify the photo, the empty mouth, the photo as evidence. Remember to have each section of the witness sign: when the transportators deliver the goods to the laboratory, verify the quantity of the goods, the packing condition is verified, and the shipping personnel sign; The instrument and components after the opening of the box shall be signed by the engineer after the acceptance of the formal contract. When conducting the index acceptance, the two parties confirm the signature after the data is printed. Ii. Some matters needing attention in installation, debugging and index acceptance 1. Installation of air conditioning, ventilation, UPS uninterrupted power supply and other infrastructure in advance according to the instrument. 2. Installed in the instrument to former ask manufacturer to prepare notice, ready in time the third party accessories, such as the cylinder, pressure reducing valve, pipe, standard (some of the acceptance with engineers will also bring some), solvent, etc. So as not to waste time after engineer arrived. 3. If the instrument is equipped with a chemical source, it should also be prepared to prepare the methane gas and corresponding pressure-reducing valve (the pressure-reducing valve of methane is anti-buckle, ordinary nitrogen helium gas canno

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档