建筑施工技术(Construction technique).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑施工技术(Construction technique)

建筑施工技术(Construction technique) First, fill in the blanks 1. When earthfill, the commonly used compaction method is roller compaction, compaction method and vibration method. The construction method can be divided into prefabricated piles and cast-in-place piles. 3. The masonry process of brick masonry includes the copying of the line, the bottom of the tile, the number of vertical leather, the hanging line of the corner, the brickwork and the sealing, the installation of the floor and other processes. 4. The connecting method of steel bar has binding connection, mechanical connection and welding connection. According to the local temperature data, the concrete structures should be adopted during the winter period, when the average outdoor temperature is steady below 5 degrees Celsius for five consecutive days. 6. The concrete curing method has natural curing, standard curing and artificial curing. 7. The underground coil is waterproof according to the location of the cover and the outer and external anti-internal tape. 8. Paint construction methods include brush painting, rolling, spraying, scraping and painting, etc. 9. The method of preventing and controlling flow sand has the method of underwater excavation, the construction method of the dry water period, the construction of the support structure, the artificial lowering of the underground water level method, the throwing of the big stone and the underground continuous wall method. 10. The main factors that affect the compaction of filling soil are the compaction work, the moisture content of soil and the thickness of each layer of soil. 11. The steel welding method mainly includes flash butt welding, arc welding, electroslag pressure welding and resistance spot welding. 12. When prefabricated pile is sunk, when the pile size, depth and length are not at the same time, it is advisable to hit the pile with short, deep and shallow after first. 13. The methods of the prestressed concrete channel for prestressed con

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档