施工测量(Construction survey).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工测量(Construction survey)

施工测量(Construction survey) Engineering before construction, should be fully familiar with the design documents, on the basis of disclosure by the exploration design units for site measurement, according to the design to the bench mark, conductor pile, intersection, etc., do a handover record, in the construction within the scope of the surveying markers, proper protection measures must be taken. In terms of the measurement, it is necessary to emphasize the protection of the pile bit, that is, after the design unit has been handed in, it should be protected in time by means of brickwork or concrete block, so as to avoid loss. These piles are generally in farmland or residential areas, which are easily damaged by human beings, and if they are destroyed, the survey and design units will be used for retesting, which will not only delay the construction, but also increase the cost. Second, middle line retesting and sideline release The middle line measurement is based on the fixed line measurement, and the plane position of the middle line of the road is marked in detail on the ground. It with alignment measurement difference: alignment measurement, just transfer road intersection point and line segment of the necessary points marked, in the middle line measurement, according to the intersection point and the turning point of the road with a series of wooden line segment with detailed calibration curve segment on the ground. The fixed line measurement is generally carried out by the surveying and design unit, and then the relevant pile bits and measurement results are handed over to the construction unit, which is carried out by the construction unit to carry out the midline and the construction survey. The road foundation should fully recover the Central Line before the start of the project, and then hammer out the roadbed posts according to the piles and related regulations in the recovery line. The following points should be taken in regard to the middle - line retest

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档