上海松浦大桥(Shanghai songpu bridge).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
上海松浦大桥(Shanghai songpu bridge)

上海松浦大桥(Shanghai songpu bridge) Matsuura Ohashi is located in the southeast of Songjiang County Township Village Chedun Yexie and Huangpu River in Minhang, West 12.5 kilometers upstream, is a railway and highway bridge. In June 1972, the Central Committee of the CPC and the State Council approved the construction of Shanghai petrochemical complex. In order to fit in with the construction of the general petrochemical plant and the overall planning of the city of Shanghai, to facilitate traffic on both sides of the Straits, develop the economy, consolidate national defense, build the first bridge across Huangpu River and build a pavilion road. The lower layer of the bridge provides trains for the past, and the upper floors for the road vehicles. Railway, highway bridge to the upstream bifurcation: Railway North of New South Min Jinshanwei branch, Shanghai petrochemical plant; Road North North Pine Road, Nantong Ting Feng, South Pavilion road. The main bridge bridge for continuous steel truss structure. The lower part of the structure of 3 River pier, a total of 4 holes; the upper structure is 96 + 112 + 112 + 96 meters, riveted triangular steel truss continuous beam bridge, a total length of 419.6 meters and 112 meters; the middle fulcrum fulcrum cross set 6 Migaojia Jin two main truss string; in a distance of 6.02 meters, the main truss internode was 8 meters, 6 meters wide beam. The longitudinal slope of the bridge is 2 per thousand, and the clearance of the bridge is 10 meters. The design load of highway bridge is steam 20, trailer 100, with a total length of 1858.45 meters. Two lane, bridge width of 9 meters, both sides of the width of 1.5 meters wide sidewalk. The north and south sides of the approach spans of the bridge have 22 holes, each with a span of 32.7 meters. Besides the pier No. 0~5 on the north bank and pier No. 4~9 on the south bank, each bridge has a radius of 800 meters, all of which are in the straight line. The straight line section is 3% downhill,

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档