- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程部门管理制度(Engineering department management system)
工程部门管理制度(Engineering department management system)
Engineering management
As an engineering project manager, I have found some engineering management experience in the management and production of several project projects, and now I will summarize some experiences to communicate with you.
First, establish the status of the site manager to institutionalize the day-to-day management of the project
Site manager is responsible to the routine processing site, we must first clear in the engineering master in site manager identity, request site foreman at the scene of the construction project manager really play the role of management core, lead and guide the construction team in the rational and scientific under the condition of the construction. As in YaoXie building engineering project management, construction site foreman Wang Gang as project director stick to a weekly safety meeting, will be found in the last week security check safety problems and according to the characteristics of the work next week should be paid attention to all the safety of construction personnel, to implement safety measures to each construction personnel. Tissue engineers and insisting on Monday afternoon and site construction captain led hon, qc inspector to check the construction quality and safety, and discover the problems existing in the construction of a detailed record. During the construction quality meeting held in the afternoon, the rectification opinions were put forward for the problems that occurred during the inspection. The construction progress meeting will be held every Wednesday afternoon, and the construction teams will report the construction progress of this week and the construction schedule of next week in writing. And the difficulties encountered in the construction should be submitted to us so that we can master the scene dynamics timely, assist in solving difficulties and make the project work smoothly.
2. Establish the technical responsibility of the department to m
您可能关注的文档
- 化学 氧化态相关知识(Knowledge of chemical oxidation state).doc
- 化学(人教版)(Chemistry (human education edition)).doc
- 化学120个易错(Chemical 120 is easy to be wrong).doc
- 勇者斗恶龙9 金手指大全(The brave dragon has nine golden fingers).doc
- 化学8.1(Chemistry (8.1)).doc
- 化学PH(Chemical PH).doc
- 化学五年高考真题精练(Five years of chemistry college entrance exam is refined).doc
- 化学化工环境(Chemical chemical environment).doc
- 化学反应与能量变化(Chemical reactions and energy changes).doc
- 化学周期表记忆技巧(Chemical periodic table memory technique).doc
- 工程科技(Engineering science and technology).doc
- 巧妙回答业主提问(Answer the owners' questions skillfully).doc
- 巧用PPT的录制旁白功能(Use PPT to record the narration function).doc
- 巴尔蒂斯(Barr di).doc
- 巴黎大学介绍(Introduction to the university of Paris).doc
- 市场营销学试题及其答案(吴健安)(Marketing questions and answers (wu jian 'an)).doc
- 带人名的英语习语(English idiom with a person's name).doc
- 干燥图例(Dry legend).doc
- 帐篷一系列的介绍(A series of introductions of tents).doc
- 帮助他人的名言(A famous saying to help others).doc
文档评论(0)