- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑术语总则小汇(General clauses of construction terminology)
建筑术语总则小汇(General clauses of construction terminology)
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
1 general provisions 1.01 for the standardization of industrial and civil engineering area calculation, unified calculation method, the formulation of this specification. 1.02 this specification applies to the calculation of the size of newly built, expanded or converted industrial and civil construction projects. 1.03, the construction area should be calculated in accordance with scientific and rational principles. 1.04 the construction area shall be calculated in accordance with the present regulations, and shall conform to the relevant standards and regulations of the state. 2 term 2.01 storey story height the vertical distance between two floors or floors and floors. 2.02 natural layer floor floor by floor and floor structure. 2.03 overhead layer empty space building deep foundation or slope building hanging overhead parts without backfill formation of architectural space. 2.04 corridor corridor Gallery horizontal transport space of buildings. 2.05 pick corridors, overhanging, corridor, pick out the horizontal traffic space on the exterior wall of the building. 2.06 eaves corridor eaves Gallery set in the bottom of the building under the eaves of the horizontal transport space. 2.07 corridor cloister, in the buildings, halls, halls, located in the two or more than two layers of back corridor. 2.08 door foyer at the entrance of the building to set up the separation, wind, cold and other architectural transition space. 2.09 building passage passage provides the building space for the road to pass through the building. 2.0.10 an elevated corridor, bridge, way, between buildings and buildings, on two or more floors, specifically for the horizontal traffic setting of the corridor two. External wall and outdoor ground or scattered water contact thickened part of the
您可能关注的文档
- 后现代主义广告词(Post modernist advertising words).doc
- 回撤胶带输送机安全技术措施(Technical measures for safety of belt conveyor).doc
- 回溯 迷宫问题(Backtracking maze problem).doc
- 回溯法-0-1背包问题(Backtracking -0-1 knapsack problem).doc
- 回眸历史记载的赵氏孤儿(Review of historical records of the orphan).doc
- 回到作为理想和信念的家园(Return to the homeland of ideals and beliefs).doc
- 回采巷道冲击地压事故分析与防治措施管理(Analysis and prevention measures of rock burst accident in mining tunnel).doc
- 固定资产管理制度(Fixed assets management system).doc
- 国企税负系私管理企5倍 垄断业薪酬增幅低于均值(State owned tax burden system 5 times private management, monopoly pay growth is lower than the average).doc
- 国债和国债市场(Treasury bonds and treasury bonds market).doc
最近下载
- 20G520-1_2_2020年合订本_钢吊车梁_6m_9m_.docx VIP
- GB50150-2016 电气装置安装工程 电气设备交接试验标准 (2).pdf VIP
- 部分常用岩土物理力学参数经验数值.doc
- 医院消防安全应急预案演练脚本.docx
- 幼儿园公开课小班教案.pptx VIP
- 华东交通大学2015—2016学年第一学期《复变函数》期末B卷.doc VIP
- 2025年春季学期学校迎督导工作汇报.pptx VIP
- 中国医院协会患者安全目标(2025版)及细则.doc VIP
- 脓毒症诊断与治疗临床规范指南(2025年版).docx VIP
- 电子病历系统功能应用水平分级评价标准(最新版,附评分表).docx VIP
原创力文档


文档评论(0)