- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
单位工程量计算的基本方法(Basic method of unit volume calculation)
单位工程量计算的基本方法(Basic method of unit volume calculation)
Summary of formulas for calculation of engineering quantities
Summary of formulas for calculating quantities of Civil Engineering
Leveling site: excavation, filling, transportation and leveling of buildings with a thickness of less than 30cm
1. Calculation rules of leveling site
(1) list rules: according to the design drawing size, the first floor area of the building is calculated.
(2) quota rules: according to the design drawing size, the first floor area of the building is calculated.
2. Calculation method of leveling site
(1) the leveling area of the list rule: the flat area of the list rule = the floor area of the first floor
(2) the leveling area of the quota rules: the level of the quota rules, the floor area = the floor area of the first floor
3, matters needing attention
(1) in some areas, quota rules leveling area: the exterior line put 2 meter. Calculation, according to the outer wall outside the line of 2 meters of graphics block calculation, and then with the bottom floor area combined calculation; or according to put 2 meters outside the center line * 2= outside 2 meters area, and the bottom floor area combined calculation. In this case, the following difficulties arise in the calculation:
It is troublesome to divide blocks, the arc part is not easy to handle, and the error is easy to occur.
2. The central line of 2 meters is more troublesome and difficult to calculate.
After 2 meters outside, there may be overlapping parts. How many bad calculations should be deducted?.
(2) in the list environment, the price of the leveling site may be calculated according to the actual situation of the bidder when the bidder quoted the price, and the length of each outside is not the same.
Large excavation earthwork
1 rules for excavation earthwork calculation
(1) list rule: dig the foundation earthwork according to the design drawing size and calculate the depth of excavation with the base cushion area.
(2) quota
您可能关注的文档
- 华为、美能达的绩效考核秘诀(HUAWEI, Minolta performance tips).doc
- 华南植物,不全(Southern China plant, incomplete).doc
- 华南师大外文学院真题(Southern China Normal College of foreign languages.).doc
- 华佗五禽图健身法练习要领(Hua Tuo five bird figure fitness method exercise Essentials).doc
- 华南理工大学2012考研复试分数线公布(South China University of Technology 2012 postgraduate entrance examination retest scores announced).doc
- 华帝减利润 不要怪奥运(Don't blame the Olympics for Vatti's profit margins).doc
- 华附初中趣味数学题(China Junior High School Math interest).doc
- 华立集团对标胜任素质模型开发领导力(HOLLEY group benchmarking competency model development leadership).doc
- 单位发放实物福利的财税处理(Fiscal and taxation treatment of unit offering physical benefits).doc
- 卓越团队训练(Team training excellence).doc
- 乌鲁木齐职业大学单招《物理》考前冲刺练习及参考答案详解(基础题).docx
- 天府新区通用航空职业学院单招《职业适应性测试》每日一练试卷及完整答案详解一套.docx
- 2025重庆公共运输职业学院单招《职业适应性测试》能力提升B卷题库含答案详解【巩固】.docx
- 2025邢台应用技术职业学院单招《语文》试题附完整答案详解【全优】.docx
- 2025湖南食品药品职业学院单招《英语》真题含答案详解【名师推荐】.docx
- 邵阳职业技术学院单招《职业适应性测试》试题预测试卷(全优)附答案详解.docx
- 2025一季度教学教育课件新模板.pptx
- 2025长春师范高等专科学校单招《职业适应性测试》自我提分评估含答案详解【B卷】.docx
- 驻马店职业技术学院单招《职业适应性测试》复习提分资料【考点梳理】附答案详解.docx
- 法律风险管理与数据隐私保护.pptx
文档评论(0)