- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
南京橱柜定做(Nanjing custom made cabinets)
南京橱柜定做(Nanjing custom made cabinets)
Nanjing: Nachison furniture cabinet
A normal cabinet custom-made procedures:
1., in front of the decoration workers approach foot, according to the specific circumstances of the kitchen and refrigerators, microwave ovens, sinks, hoods, kitchen treasure, etc., the size of electrical products, axis side drawings.
2. in accordance with the decoration personnel coordinate and put forward water. Gas. Smoke. Tube rectification, mark the flue. The proposed amendments for position payment drawings and launching various types of electrical socket, the cabinet shape can conform to the wishes of the customer.
3. according to the plans, etc. after the wiring in the tiling, the scene third times longer feet, make practical isometric drawings, signed a contract to make payment
The construction period is usually 15-20 days to deliver the installation.
4. cabinets installed after measuring cabinets table, so that you can guarantee the reasonableness of the size, but also for you to have sufficient time to choose the table of the matching color
Two. Pay attention to matters before tiling:
1., according to whether the cabinet installed kitchen treasure. Microwave ovens, and other, such as refrigerators and other electrical sockets and switches position, take care of the overall design of the kitchen.
The cabinet behind the 2. Yin Taiwan wall is best not to do tile, insulation layer should be the ideal choice. Generally good cabinets, back panels should be inserted board structure, and the wall has 15-18mm of the empty volume, easy to air circulation, there will be no problem.
Three, check before installing the cabinet:
Is the upper and lower 1: nozzles in the desired position?! Sheung Shui pipeline is best not less than 400mm, easy to connect faucet and kitchen treasure, etc., the height of the sewer pipe is best not more than 100mm or not less than 200mm, so that when installing cabinets, the cabinet to minimize the dynamic saw.
2: check whether
您可能关注的文档
- 华为、美能达的绩效考核秘诀(HUAWEI, Minolta performance tips).doc
- 华南植物,不全(Southern China plant, incomplete).doc
- 华南师大外文学院真题(Southern China Normal College of foreign languages.).doc
- 华佗五禽图健身法练习要领(Hua Tuo five bird figure fitness method exercise Essentials).doc
- 华南理工大学2012考研复试分数线公布(South China University of Technology 2012 postgraduate entrance examination retest scores announced).doc
- 华帝减利润 不要怪奥运(Don't blame the Olympics for Vatti's profit margins).doc
- 华附初中趣味数学题(China Junior High School Math interest).doc
- 华立集团对标胜任素质模型开发领导力(HOLLEY group benchmarking competency model development leadership).doc
- 单位发放实物福利的财税处理(Fiscal and taxation treatment of unit offering physical benefits).doc
- 卓越团队训练(Team training excellence).doc
文档评论(0)