中国管理资讯网--知识库--项目管理新工具设计结构矩阵(China Management Information Network -- knowledge base -- a new tool for project management design structure matrix).docVIP
- 21
- 0
- 约7.77千字
- 约 8页
- 2017-07-25 发布于河南
- 举报
中国管理资讯网--知识库--项目管理新工具设计结构矩阵(China Management Information Network -- knowledge base -- a new tool for project management design structure matrix)
中国管理资讯网--知识库--项目管理新工具设计结构矩阵(China Management Information Network -- knowledge base -- a new tool for project management design structure matrix)
China Management Information Network - knowledge base -- new tool for project management: design structure matrix, your current position: China management information network, case library, project management
New tools for project management: design, structure, matrix
Author: Anonymous: from Chinese project management network update: 2006-3-2 popularity: 259
Traditional project management tools, such as the PERT diagram and Gantt chart, are designed to help project managers arrange the sequence of tasks reasonably when managing large construction projects. The features of these tasks are sequential and independent. However, in the process of innovation (such as product development), the application of these tools is very inconvenient, because they can not clearly describe the flow of information between front and rear tasks. The questions that traditional tools answer are: what other tasks must I accomplish before I begin this task? While product development planning, especially the planning staff of high-tech enterprises, is a tool to answer such a question: before I finish this task, I need to get what information from other tasks?
The author introduces a project management tool called the design structure matrix (DSM). Unlike traditional tools, this tool focuses on the information flow of the project rather than on the workflow. The first step in drawing DSM is to list all the tasks in the current order of execution, which are arranged in the same order in the horizontal and vertical directions, forming a matrix of rows and columns. Then each of the lines corresponding to each task is marked with other tasks that provide the necessary information for it. (see illustration)
This DSM can clearly show what information exchange will be involved in the design iteration (this article refers to the iterative according to the pr
您可能关注的文档
- --华安盛道管理网 生产线平衡的定义(Definition Huaan Shengdao management network production line balance).doc
- ACAA认证室内设计师模拟题2(ACAA certified interior designer mock 2).doc
- 73慢性风湿性心瓣膜病(73 chronic rheumatic valvular heart disease).doc
- Adobe_Illustrator_CS4快捷键2(Adobe_Illustrator_CS4 shortcut key 2).doc
- ary材质详解(Detailed description of ary material).doc
- Eviews时间序列分析实例(An example of Eviews time series analysis).doc
- 2011年中考语文备战(中考专题复习)古诗鉴赏专题(Chinese preparation for senior high school entrance examination in 2011).doc
- eye candy 4000(养眼花瓶 4000).doc
- 6(肺痨阴阳气血虚)(6 (yin and yang qi deficiency syndrome)).doc
- IT人职业规划(IT career planning).doc
原创力文档

文档评论(0)