蓄电池组放电时间(Battery discharge time).docVIP

蓄电池组放电时间(Battery discharge time).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
蓄电池组放电时间(Battery discharge time)

蓄电池组放电时间(Battery discharge time) Discussion on discharge time of storage battery The communication power supply provides an endless flow of power for communication equipment, and is an important component of communication network. In normal condition, electricity is supplied to the communication equipment by city power. If the power supply is interrupted, the standby generating set is used to generate electricity for the communication equipment. When the generator sets before starting or when the fault can not start, the battery is discharged by the storage battery to power the communication equipment. Therefore, the battery is an important part of the power supply system, and is the last barrier to ensure uninterrupted communication. If this barrier fails, it will cause serious consequences of communication disruption. Since the status of the battery is so important, it is necessary to know the capacity of the battery accurately, and then to determine the discharge time of the battery to the communication load. How to know the time of the battery load to the communication load accurately, and many people are vague about this problem. In a mobile communication base station engineering design, construction units require designers to calculate different service life of the battery discharge time of different base station load; and the author published an article that code for design of telecommunication power supply equipment installation issued by the Ministry of post and Telecommunications (YD5040 - 97) gives the calculation formula of battery discharge time too rough, conservative, battery discharge time calculated by partial discharge is smaller than the actual value, causing misunderstanding to the construction unit maintenance personnel. Through field test, the designers can know the battery using two kinds of capacity, discharge time is estimated and actual value is quite different, therefore, the author puts forward different views and discuss with everybody.

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档