- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
湖北荆州长江大桥(Hubei, Jingzhou, Yangtze River Bridge)
湖北荆州长江大桥(Hubei, Jingzhou, Yangtze River Bridge)
The maximum vertical load is 3400 T, which is the largest in china. Verify the accuracy of geological data and optimize the design by test pile.
Foundation construction
The main foundation of the main pylon and the 38 continental continuous beam of the cable-stayed bridge is supported by a steel pipe pile supporting platform and a double wall bottom steel boxed cofferdam. The inner diameter of the steel box is 33 m, the outer diameter is 36 m, the height is 35m, and the back cover concrete is poured at one time. 4250m. The pile foundation construction is made of homemade large drilling rig and self-made drill bit. The mechanical equipment and construction technology of deep water large diameter bored pile passing through 80 m sand gravel layer are successfully solved.
The main girder design
The main girder of the cable-stayed bridge adopts the prestressed concrete rib plate structure, which has the advantages of definite force, light structure and convenient construction.
The construction of main girder
The main beam is constructed with a front pivot basket, with a section length of 8m and a heaviest section of more than 530 t.
The static model test
In order to check the correctness of the design and calculation of cable-stayed bridge to ensure the overall strength and stability of the North Branch of the main span of 500 m PC cable-stayed bridge is carried out in 1 to 30 Aluminum Alloy model static stability test, to fully grasp the structure weight, vehicle load and unbalanced construction loads, distribution of cable force and the internal force of the main beam, to determine the load conditions of structural instability in the maximum cantilever state and bridge condition, and analyze the influence on the structure of static stability of nonlinear structure.
The wind tunnel test.
Segmental model wind tunnel test, buffeting response analysis and aeroelastic test of bare tower are carried out on main span 300m and 50
您可能关注的文档
- 正确删除C盘无用的文件(The right to delete useless files c).doc
- 正确处理绩效考核评价过程中的问题(Correctly deal with the problems in the process of performance appraisal).doc
- 正高程、正高、高程异常、大地高(The height, height, height and height of the earth are high).doc
- 正统的《帮兵决》(The official Gang decision).doc
- 正确对待0-6岁宝宝的不合作行为(Correctly treat the 0-6 year old baby's uncooperative behavior).doc
- 此生被子把眼泪擦干净(In this life, wipe your tears).doc
- 步步高I518(BBK I518).doc
- 步进电机使用的一些问题(Some problems of stepping motor).doc
- 步进电机(键盘控制可调速)(Stepper motor (keyboard control, adjustable speed)).doc
- 步进电机小知识(Small knowledge of stepper motor).doc
最近下载
- 2025年护士资格肿瘤试题及答案 .pdf VIP
- 2025.6.27--12、博微配电网工程设计软件使用手册.pdf VIP
- 阿里巴巴集团股权结构分析.doc VIP
- 锡安长老纪要1-24本.pdf VIP
- YYT 0735.1-2009 麻醉和呼吸设备 湿化人体呼吸气体的热湿交换器(HME) 第1部分:用于最小潮气量为250mL的HME.docx VIP
- 汽车仪表盘图标全解.docx VIP
- 阿里巴巴上市后的股权结构(阿里巴巴最新股权结构).doc VIP
- 氧气、乙炔管理制度.docx VIP
- 上海众辰NZ100变频器用户使用说明书调试手册.pdf
- 伴有肺炎的肺脓肿多学科决策模式中国专家共识(2025版).docx VIP
原创力文档


文档评论(0)