箱梁节段预制与拼装施工监理(Construction supervision of precast and assembled section of box girder).docVIP

箱梁节段预制与拼装施工监理(Construction supervision of precast and assembled section of box girder).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
箱梁节段预制与拼装施工监理(Construction supervision of precast and assembled section of box girder)

箱梁节段预制与拼装施工监理(Construction supervision of precast and assembled section of box girder) The storage sequence of box girders shall be set up scientifically and reasonably. (3) the number of storage shall be calculated after the approval of the engineer. 2.2 section box girder assembling Check the 2.2.1 before shipment (1) before shipment by check number, frame beam and matching surface cleaning pipe flow. (2) the pier top block needs two times pouring should be reinforced banding, and embedded parts installation template. 2.2.2 pier top 0# block installation (1) install the support before installation, and the top surface roughness and the four angle elevation should be strictly controlled. (2) after installing and placing the pier top block, the 4 positioning jack shall be accurately positioned. The positioning standard shall be the axis deviation 5mm and the elevation + 10mm. (3) accurate positioning after passing the temporary anchorage of pre-stressed pier top block 0#. 2.2.3 standard T box girder assembly Segmental box girder erection (1) the assembly shall be carried out before the erection of the segmental box girder, in order to verify the close relation between the box girders and prepare for the formal assembly. (2) segmental box girder joint with epoxy adhesive bonding of Italy sika, construction should be selected according to the type of epoxy adhesive construction temperature. (3) check whether the bellows gasket is well arranged before gluing, and ensure that the thickness of the coating is uniform, and not less than 3mm. If you need to pad the epoxy gasket, the coating should be higher than the gasket 1mm. (4) when the prestress is tensioned in the body, the construction shall be carried out strictly according to the provisions of the drawing, and the tensile stress and elongation (+ 6%) shall meet the requirements of the specifications. When all the prestressing forces are tensioned, the main hook of the bridge erection machine can be lifted. (5) vacu

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档