- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
挖孔灌注桩工艺标准(Technical standard for digging hole filling pile)
挖孔灌注桩工艺标准(Technical standard for digging hole filling pile)
Construction process standard of excavated filling pile?
1. The material?
(1)? Cement: use 425 # pusi or slag cement, and have the factory certificate and test report. ?
(2)? Sand: medium sand, less than 3 %. ?
(3)? Pebbles: gravel, 10-15mm particle size, with less than 2% mud content. ?
(4)? Reinforcement: the varieties and specifications are in accordance with the design requirements, and there are factory certificate and test report. ?
(5)? Block: 1. 2. 5 cement mortar pulse 18-22 fire iron wire advance prefabrication. ?
(6)? Admixtures: admixtures, according to the construction need and confirmed by the test. ?
2. Operating conditions?
(1)? Construction site, must be done three general and one level, and according to the situation of the situation, have the condition to do the ground concrete cushion first, eli construction. The site should be surrounded by drainage ditch, collecting well and water in pile hole. The excavation of the site should be unblocked. ?
(2)? According to the construction drawing, the Central Line and the diameter of the pile are put out, and the technical review is taken seriously, and the relevant departments can handle the visa formalities to excavate the soil. ?
(3)? Before digging the pile, four core control points should be brought out to the four sides of the pile, with a strong wooden stake. ?
(4)? Before construction, construction site technical director and the builder shall be prepared by hole overhaul construction, technical clarificaiton safety and safety education, step by step to make the measures in ideology, organization, safety and technology management are implemented. ?
(5)? The special person is responsible for the record of the vertical center line, axis, pile diameter, pile length and bedrock soil quality of the pile hole. Concealed acceptance record of steel cage and pile body concrete; To collect the relevant technical data of the strength grade of the pi
您可能关注的文档
- 哈萨克的历史(Kazakh history).doc
- 哑铃锻炼法(Dumbbell exercisers).doc
- 唐僧超搞笑语录(Tang's monk super funny sayings).doc
- 商业机密常识(Trade secrets).doc
- 唯一一个看懂《山楂树之恋》的人,太震惊了(The only person who understood the hawthorn tree was shocked).doc
- 商山四皓 百度百科(Shang shan four hao baidu encyclopedia).doc
- 商鞅简介(Shang Yang profile).doc
- 喂食康敏元中唾液乳杆菌抑制过敏呼吸道反应动物实验结论(The results of the study on the control of salivary lactobacillus in the feeding of kangmin were concluded).doc
- 啤酒糟养鸭资料集锦(Beer poor duck collection).doc
- 善读者读出了什么(What does the good reader read).doc
- 挑筋疗法(Pick muscle therapy).doc
- 挥之不能去的心理阴影(The psychological shadow that cannot be waved).doc
- 据说是乾隆的太医留下来的(It is said that the doctor of the emperor qianlong stayed).doc
- 排序指标(Sorting indicators).doc
- 探秘世界各国警犬(Visiting the world's police dogs).doc
- 探究提高农村小学生英语语言知识与语言技能的对策(To explore the countermeasures to improve the English language knowledge and language skills of rural primary school students).doc
- 接地说明(Grounding instructions).doc
- 护理学毕业论文糖尿病病人的护理方法(Nursing method of nursing graduation thesis diabetes patients).doc
- 控烟知识(Tobacco control knowledge).doc
- 控制器说明书(Controller specification).doc
文档评论(0)