农夫打发(The farmer sent away).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
农夫打发(The farmer sent away)

农夫打发(The farmer sent away) Treatment of super large outburst water in Kailuan fan coal mine At 10:20 on June 2, 1984, a sudden outburst of water inrush occurred in the world mining history in the 2171 fully mechanized mining face of Fan Zhuang mine. The water inrush point is 71.5 meters away from the working surface at the air return road, the elevation is -313 meters, and the water inflow at that time is 203 cubic meters per minute. After pervious to water, in the working face of fully mechanized four team leader often come to rescue the water pump driver Liu Jingxin, two people were poured out of the water blocked inside. 10:50 when the mine control room received mine flooding report, the mine immediately convened an emergency meeting, the chief engineer Zhu Jiwei, deputy director Wang Tiefan, rushed to the scene, emergency notification and emergency rescue ambulance personnel under mine wells. At the same time, by the Party committee secretary Zhang Fengge and other officials and related personnel quickly composed of emergency command, organization and leadership of emergency rescue work. 10:55 branch total control room received mine report, is studying the basic construction work of the Bureaus secretary, chief engineer, deputy chief engineer immediately adjourned, rushed to the Fangezhuang Coal Mine, and emergency notification, Linxi Tangjiazhuang mine rescue team rushed to the two Fangezhuang Coal Mine Emergency rescue. Bureau Chief Engineer Li Chengdong and so on rushed to the mine site. Li Chengdong after listening to a brief report on mine chief engineer Zhu Jiwei, immediately on the rescue measures: plug shed file, to avoid the coal wall collapse again; an air vehicle, to ensure the rescue workers from being smoked down; dig cut bypass rescue. Li Chengdong then took the lead, jumped into the waist deep cold water, Zhu Jiwei also jumped into the water. They and 20 rescue team members pulled a rope four times successively through two roof area close to the f

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档