- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
边际容量成本05
1408 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 20, NO. 3, AUGUST 2005
One-Year Deferral Method for Estimating Avoided
Transmission and Distribution Costs
Xin Li, Member, IEEE, and Garry K. Zielke, Member, IEEE
Abstract— This paper presents a new method for estimating similar drawback exists with the approach used in our existing
avoided transmission and distribution costs associated with small avoided study.
load reductions, named the one-year deferral method. It is estab- As indicated in [3], the deferral time in the PW method may
lished on the basis of the system planner’s actual response to a
small reduction in the forecast annual peak load. This paper has take a noninteger value (i.e., a fraction of a year) that is equal
also explored the noninteger deferral time (i.e., a fraction of a to the ratio of peak load reduction to annual load growth. Thus,
year) in the present worth method, which is seemingly inconsistent the scope of the PW method may be extended to the case of any
with the system planning practice. In addition, as allowed by small load reduction. This approach, however, has a concep-
the new method, the effect of the size and type (shape) of a load tual problem. In practice, the TD capital budget is planned/
reduction stream (i.e., a series of reductions in the forecast annual
peak loads) on avoided costs is studied, which is important for maintained by system planners to meet the forecasted annual
determining generic avoided cost values intended for various peak load that occurs either in the summer or in the winter. If
applications. an item in the budget can b
您可能关注的文档
最近下载
- 施工组织设计报审表施工组织设计报审表.doc VIP
- 2024-2025学年高二物理专项复习:波的干涉【五大题型】(解析版).pdf VIP
- CYX-QEHP-06人力资源控制程序E0.doc VIP
- 化学品船的洗舱和验舱指南 .pdf VIP
- 胰十二指肠切除术后胃瘫的诊治策略.pptx VIP
- 四川成都市简州新城投资集团招聘笔试题库2023.pdf VIP
- 民航管制运行风险主题探索.docx VIP
- HGT20510—2014仪表供气设计规范.pdf VIP
- 网课实验室安全与管理答案(潍坊医学院).docx VIP
- 2024年风景园林专业中级职称《法律法规及技术标准》考试题库(含答案).docx VIP
文档评论(0)