- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
品管圈活动在降低气动物流运送等待时间中的实践-中国护理管理
护理质量
Nursing Quality
品管圈活动在降低气动物流运送等待
时间中的实践
吴海英 韦雪虹 贾艳丽 包映辉 张勇军 魏晋才
[ 摘 要] 目的:通过规范物流运送的管理办法,降低气动物流运送等待时间,充分发挥气动物流优点,提高医院整体工作
效率。方法:开展以“降低气动物流运送等待时间”为主题的跨科室品管圈活动,采用现状调查方法对运送量相对较多的 9 个
站点的物流运送等待时间进行了调查研究,通过分析研究制定相应的对策并在全院组织实施,比较开展品管圈活动前后物流运
送平均等待时间。结果:物流运送等待时间从原来的平均 7.44min下降到平均 4.78min,明显提高了整体工作效率。结论:跨
科室品管圈活动在降低气动物流运送等待时间中效果显著,有效地提高了工作效率,也充分提高了团队协作能力。
[ 关键词 ] 跨科室;品管圈; 物流运送;等待时间
[中图分类号] R47 [DOI] 10.3969/j.issn.1672-1756.2013.011.019
The practice of Quality Control Circle in reducing waiting time of pneumatic tube transport / WU Hai-ying, WEI Xue-
hong, JIA Yan-li, et al. // Nursing Department, Dongyang Peoples Hospital, Wenzhou Medical University, Dongyang, Zhejiang
province, 322100 China /// Chinese Nursing Management- 2013,13(11): 60-63
[Abstract] Objectives: To reduce the waiting time of pneumatic tube transport by standardizing the managerial approach
of pneumatic tube transport systems, to bring the advantage of pneumatic tube transport into full play, and to promote overall
hospital working efficiency. Methods: We carried out the activities of Quality Control Circle with the theme of reducing waiting
time of the cross department pneumatic tube transport. We investigated the waiting time in nine busy sites, formulated the
countermeasures, put it into practice, and then compared the average waiting time before and after the activites. Results: The
waiting time of pneumatic tube transport decreased from 7.44 minutes to 4.78 minutes and this obviously improved overall
working efficiency. Conclusion: The activity of cross department Quality Control Circle in different departments could reduce
waiting time of pneumatic tube transport and improve the working efficiency and team working ability.
[ ]
Key words cross department; Quality Control Circle; pneumatic tube transport; waiting
文档评论(0)