造价员考试习题(Cost test exercises).docVIP

  • 2
  • 0
  • 约2.29万字
  • 约 29页
  • 2017-07-29 发布于河南
  • 举报
造价员考试习题(Cost test exercises)

造价员考试习题(Cost test exercises) 1, the following items belong to the world bank, the cost of the formation of the project, the cost of the intermediate is (). A. off premise facility charges B. salary of field personnel in construction management C. service building fee D. vehicle fee Answer: B 2, the following prices can not be used as domestic equipment, the original price is (). A. delivery price B. contract price C. cost price D. supplier quotation Answer: C 3, in calculating the standard price of domestic standard equipment, the general use (). A. does not have the original price of spare parts B. the original price calculated by a fixed valuation method C. CIF D. has the original price of spare parts Answer: D 4, imports of a device, the known port of shipment price of $5 million, the international freight rate of 7.5%, transportation insurance rate of 4%, tariff rate of 15%, value-added tax rate of 17%, consumption tax The tax rate is 10%, and the dutiable value of the equipment is (RMB) 10000 yuan. ($1 =8.10 yuan) A.6780 B.6102 C.4535 D.5215 Answer: C 5, when calculating the import and export equipment fees, the base fee for import equipment (). A. CIF price B. FOB C. CIF D. median price Answer: A 6, banana map all activities are at the latest time, () A. savings in construction funds, loan interest is detrimental, B. lowered the guarantee rate for the completion of the project on schedule, C. savings in construction funds, loan interest is favorable D. raised the guarantee rate of the completion of the project on schedule, Answer: BC analysis: Generally speaking, all activities are started at the latest time. It is beneficial to save interest on construction funds and loans, but at the same time reduce the guarantee rate for the completion of the project on schedule Determine the investment expenditure budget to achieve the purpose of both saving investment and controlling the time limit of the project 7, the double code timing network plan, () is the key line

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档