土石方工程(Earthwork)
Earthwork
Before calculating earthwork quantity, the following data shall be determined:
1. Determination of soil and rock categories: classification of soil and rock works, soil and rock types, as determined by the engineering survey data in comparison with the soil and rock (Platts) classification table (see table 1-9);
2, the water level elevation and drainage (water) method;
3, earthwork, trench excavation, (fill) start and end elevation, construction method and distance;
4, rock excavation, blasting method, slag removal method and distance;
5, other relevant information.
Two. General rules
1. The earthwork volume is calculated by the natural dense volume before excavation. If you need to convert, you can convert the values listed in table 1-3.
Earthwork volume conversion table (table 1-3)
-: -: -: -
The volume of virtual party volume density, natural tamped volume, loose filling volume
- + - + - + -
1 / 0.77 / 0.67 / 0.83
1.30 / 1 / 0.87 / 1.08
1.50 / 1.15 / 1 / 1.25
1.20 / 0.92 / 0.80 / 1
- the top of the top - the top -
2. Excavation shall be calculated according to the elevation of the designed outdoor floor.
Three. Leveling and rolling
1, artificial leveling site refers to the construction site excavation and filling, earthwork thickness of less than 30cm and leveling. When digging and filling earth thickness is more than + 30cm, the vertical layout shall be calculated separately according to the site earthwork balance.
2, leveling site works according to the outer wall of the building, the outer edge of each side plus 2m, to square meters.
3. The ground compaction of the building site shall be calculated in square meters, and the filling thickness shall be calculated in cubic meter according to the figure.
Four, groove, foundation earthwork
1, groove and foundation pit division:
Where the groove bottom width is within 3M, and the groove length is more than 3 times of the groove width, the groove is groove.
Where the pit area is less than 2
您可能关注的文档
- 埋地给水管道安装的施工方案(Construction scheme of buried water supply pipeline installation).doc
- 吕雉(Pheasant).doc
- 名车(Cars).doc
- 名词解释与答案(Noun explanation and answer).doc
- 名词解释与分类(Interpretation and classification of nouns).doc
- 名词解释 - 副本(Noun interpretation - copy).doc
- 名解(2)(Famous solution (2)).doc
- 名解和神经系统(Name solution and neural system).doc
- 名门俏新娘(A pretty bride).doc
- 名片效应 - MBA智库百科(Business card effect - MBA think tank Wikipedia).doc
- 广东省广州省实验中学教育集团2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州大学附属中学2025-2026学年八年级上学期奥班期中物理试题(解析版).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(含答案).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(解析版).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 2026《中国人寿上海分公司营销员培训体系优化研究》18000字.docx
- 《生物探究性实验教学》中小学教师资格模拟试题.docx
最近下载
- 《专业工程管理与实务》.pdf VIP
- 中国血栓性疾病防治指南(2025版).docx VIP
- 施工质量日志-.xls VIP
- 2025年国家公务员全国总工会面试题及答案.docx VIP
- 合肥市普通高中六校联盟2025-2026学年高三第一次语文教学质量监测+答案.docx VIP
- 局部晚期食管癌患者新辅助免疫治疗与常规新辅助治疗的比较:系统评价和meta分析.pdf
- 2025以骑手为代表的新就业群体研究报告:职业技能与跑单时长对收入的共同作用.pdf VIP
- 年产一亿片别嘌呤醇的车间工艺设计.doc VIP
- 商务型(带电梯、地下室、效果图)三层别墅设计图.pdf VIP
- 2026年详版个人信用报告征信报告最新Word可编辑模版样板doc文件.docx
原创力文档

文档评论(0)