- 14
- 0
- 约1.52万字
- 约 14页
- 2017-08-03 发布于河南
- 举报
完工百分比法运用若干问题探讨(Application of percentage method of completion)
Application of percentage method of completion
First, problems encountered in practice.
First, the EPC contracting enterprises adopt a single percentage of completion method is not reasonable. At present, EPC is always accepted in practice
When choosing the percentage of completion, the package enterprises tend to choose the first one for the equipment sales oriented enterprises
Law, called cost percentage method. As for the construction and installation based enterprises, generally choose second methods, known as workload
Percentage method. When contracting enterprises undertake construction contracts, such as underwater projects, third methods should be chosen accordingly.
But as a EPC general contractor, if the individual chooses a certain method, it may neglect the characteristics of the corresponding business and make a brief analysis
As follows: as a EPC general contractor, the cost of design is generally low in design, equipment and building installation operations,
Although the proportion of the total amount of the contract contract is lower than the contract amount, the absolute amount of the contract is not necessarily small
Li is also relatively high. The equipment part usually accounts for the majority of the contract amount, and its gross profit margin is much lower than the design part
Gross profit margin. For the building installation part, the gross profit margin is relatively limited. At the same time, at a certain point, due to the overall bearing
The package enterprises and the owners often have some differences in the progress of the construction contract. In this context, if used only
The cost percentage approach or the workload completion rule may artificially alter the actual schedule of completion, thus contributing to the overall contracting rate
Industry revenue and expenses have some impact.
Two is the influence of price change and technology development fee on percentage of co
您可能关注的文档
- 手机按键的制作工艺(Process for making mobile phone button).doc
- 手机NTRA认证_手机NTRA认证_埃及VOC__NTRA实验室_埃及无线认证(Mobile phone NTRA mobile phone _ certification NTRA certification _ Egypt VOC__NTRA laboratory _ Egypt wireless authentication).doc
- 手机暗码大全(Mobile phone password Daquan).doc
- 手机按键指令大全(Mobile phone button instruction Daquan).doc
- 手机背后的健康危害(Health hazards behind mobile phones).doc
- 手机常用名词解析!(Common nouns for mobile phones!).doc
- 手机常用提速法(Common speed raising method for mobile phones).doc
- 手机充电器及电池原理(Mobile phone charger and battery principle).doc
- 手机代码说明及常用技巧(Mobile phone code description and common skills).doc
- 手机电池修复方法(Mobile phone battery repairing method).doc
- 完工百分比法在施工业中应用(Percentage of completion in industrial applications).doc
- 完工产品成本分配(Cost allocation of finished product).doc
- 完美解决ARP内网攻击+完美限速+ROS小包转发性能差的问题(Perfect solution ARP network attack + perfect speed limit, +ROS packet forwarding performance is poor).doc
- 完美世界仙丹配方(Perfect world elixir formula).doc
- 完工验收2(Completion acceptance 2).doc
- 完全解读Web 2_0(完全解读Web 2_0).doc
- 完全卸载Apple(完全卸载苹果).doc
- 完善干部平时考核办法- 中国日报网(Measures for improving cadres' assessment at ordinary times - China Daily).doc
- 完善企业内部会计控制的对策(Countermeasures for perfecting internal accounting control of enterprises).doc
- 完形填空常用动词(Cloze Test verbs).doc
原创力文档

文档评论(0)