- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
MRP例外消息(MRP exception message)
MRP exception message processing method
Group exception information diagnosis processing Suggestions
02, and outstanding New date in the past, and opening the date in the past in the MRP list, this exception information shows that the planned orders in a recent run MRP program created New orders outstanding date is the last date is the MRP controller conversion plan during outstanding order or purchasing application buffer time; If the planned order can be converted, the subsequent order should be converted as soon as possible.
Open date in the past of the past undated orders and the uncleared date of purchase orders is the same as the previous date
03, and past the start date of the New, and the start date in the past in the list of MRP, this exception to show that this suggestion is that in the last order plan to run the newly created suggest the start date of this order is in the past check whether this order need to arrange a date.
The Start date of Start date in the past order is in the past. Check if the order should be rescheduled and/or converted to a formal order.
63 in order to take effect before start the Production Production start before the order start is not defined in configuration allows adjustment order start date for Production start date, however, based on the process route to calculate the Production start date earlier than according to the defined in the material master data homemade time calculates the order start date. Check the material master data and the time setting in the process
New, and the end date of the past, New, and finish date in the past in the MRP list, the exception shows:
This order proposal was created at the last MRP run time. The completion date of the order is based on the reason for this situation in the past: the system configuration of the automatic front-row production in the MRP runtime has been cancelled to check whether the order proposal should have been rescheduled.
The end date of
您可能关注的文档
- 消防安全日巡查记录表及设备检查表(Fire safety daily inspection record and equipment checklist).doc
- 消防安全设计(Fire safety design).doc
- 消防安全隐患整治工作方案(Fire safety hidden trouble rectification work program).doc
- 消防电梯(Fire elevator).doc
- 消防保养(Fire maintenance).doc
- 消防疏散演练中的问题(Problems in fire evacuation drills).doc
- 消防通道知识(Fire lane knowledge).doc
- 消防预算知识点集锦(Fire budget knowledge highlights).doc
- 消费贷款变房贷(Consumer loans change mortgage).doc
- 消费讲适度,勤俭是美德(Moderation in consumption is the virtue of thrift).doc
原创力文档


文档评论(0)