- 1、本文档共21页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
考生答卷查看001(The examinee will review 001)
The examinee answers the scroll to check
Introduction to project construction supervision
A total of 35 questions in total of 100 will be shown in the scope of the test. All the questions will be shown in the whole question
1. The main difference between the use of physical method and the unit price method to prepare the construction drawing budget is (). (2.5 points) A. The calculation of other direct fees is different
B. calculation of indirect costs is different
C. The method of calculating profits and taxes is different
D. The method of calculating the sum of labor cost, material cost and construction machinery cost is different
The standard answer: D
Answer: D
Score: 2.5 minutes:
2. The contract law stipulates that if the parties agree to liquidated damages and make a deposit, they shall apply (). (2.5 points) A. The parties may claim both liquidated damages and deposits
B. The defaulting party shall choose to apply the liquidated damages or deposit
C. When one party defaults, the other party can only choose to apply the liquidated damages
D. If one party defaults, the other party may choose to apply the liquidated damages clause or the deposit clause
The standard answer: D
Answer: D
Score: 2.5 minutes:
3. In the time-scale network plan, the waveform line represents (). (2.5 points) A. Duration of work
B. virtual work
C. The time interval between work
D. the total time difference
The standard answer: C
Answer: C
Score: 2.5 minutes:
4. () is the basis for quality control of project projects. (2.5 points) A. Evaluation criteria for quality inspection
B. Contract documents
C. design documents
D. quality data file
The standard answer: B
Answer: A
Score: 0 comments:
5. extra work in the entrusted supervision contract means (). (2.5 points) A. Party bs work is inevitable in the entrusted supervision contract
B. Part of the normal work in the entrusted supervision contract
C. Termination of the supervision business due to party
您可能关注的文档
- 1 过滤风速问题 气布比(1. Filter wind speed problem gas cloth ratio).doc
- 1 氧气管道材质及管件的选用(1. Selection of oxygen pipe material and pipe fittings).doc
- 1.房产经纪人培训(二)0(1. Estate agent training (2) 0).doc
- 08和13定额对比(08 and 13 quota contrast).doc
- 1.恒温槽测试思考题答案2(1. The constant temperature tank test the answer 2).doc
- 09造价员理论试题及答案(Cost member theoretical test questions and answers).doc
- 10 操作界面与操作逻辑(Operation interface and operation logic).doc
- 10.1.1虚拟仿真施工技术(10.1.1 virtual simulation construction technology).doc
- 10-接驾科仪(10 - connect the driver).doc
- 09导游基础知识应用综合卷(一)(Guide to basic knowledge of guide (1)).doc
- 考生分享三年过了一、二级注,我的独门经验(Candidates share three years past one or two, my only experience).doc
- 考试大纲的格式(The format of the exam outline).doc
- 考试大纲数学(Syllabus mathematics).doc
- 考试进行中3(Exam 3).doc
- 考试科目高等数学(Higher mathematics for examination subjects).doc
- 考试总结(Test summary).doc
- 考试历年真题汇总(The examination is summed up in years).doc
- 考研词汇(1)(Research vocabulary (1)).doc
- 考研大纲词汇(Research outline vocabulary).doc
- 考试题及答案(Test questions and answers).doc
最近下载
- 工地禁酒免责协议书范本.docx VIP
- 海洋经济发展与海洋环境保护.pptx VIP
- 工业园区管理制度(示范版).docx VIP
- 附件行业标准目录-行业标准目录详解.PDF VIP
- 2024年甘肃张掖山丹马场招聘15人笔试模拟试题及答案解析.docx VIP
- GB51210-2016 建筑施工脚手架安全技术统一标准.docx VIP
- 旅游策划学教案.doc VIP
- 2025年吉林外国语大学辅导员招聘考试笔试备考题库及答案解析.docx VIP
- 2024年甘肃张掖山丹马场招聘15人笔试备考试题及答案解析.docx VIP
- 2025年河南省高校毕业生“三支一扶”计划招募(3000名)模拟试卷及参考答案详解一套.docx
文档评论(0)