网站大量收购独家精品文档,联系QQ:2885784924

渠化工程简答题(The canalization project is short answer).doc

渠化工程简答题(The canalization project is short answer).doc

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
渠化工程简答题(The canalization project is short answer) Where are the advantages and disadvantages of water transportation? Answer: advantages, high capacity; Traffic; Low energy consumption; Covers an area of less; Less pollution. Disadvantages, the technology speed of water transportation and business speed are low; Water transportation is greatly affected by natural conditions. 2. What are the structural types of the upper chamber of the soft foundation, and what are the applicable conditions? Answer: separate and integral. The separation type is suitable for small water level, and the foundation is insensitive to infiltration. The integral type is suitable for large water level and the foundation is silty, fine sand or silt. 3. The problems that should be paid attention to in the layout of the lock? Answer: (1) locks and approaches should be arranged in a straight line, either upstream or downstream approaches and main channel smooth connection, have to lock the ship docked, mooring enough scale, the length, width, turning radius and depth should comply with the regulations. (2) stable lock should be decorated in a straight river upstream or downstream should avoid as far as possible at the entrance of the TGP flood-discharge are easy sedimentation area, especially the convex bank sedimentation area and the hub or drainage water carrying alluvium alluvial area and flow, flow deposition area. (3) locks in the appropriate land arrangement, and should not be set in computation and discharging sluices between two water, power stations and other buildings, to avoid the drainage drainage structures of import and export navigation condition of lock approach to interference. (4) the lock chamber should be decorated on the downstream side of the water retaining structure, lock should not be commonly used for flood discharge at the same time, must be used for flood discharge in specific situations, needs in the design, layout, etc will be given full consideration and demonstrat

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档