网站大量收购独家精品文档,联系QQ:2885784924

广联达钢筋抽样检查办法(The method of sampling inspection of the reinforced concrete).doc

广联达钢筋抽样检查办法(The method of sampling inspection of the reinforced concrete).doc

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
广联达钢筋抽样检查办法(The method of sampling inspection of the reinforced concrete) Methods of inspection for the sampling engineering of ganda bar (I) basis: 1. Independent foundation: more in the frame structure, it is important to note in the calculation of reinforcement that the length of the force reinforcement of the base plate shall be 0.9 times the length of the side or width, and the layout shall be staggered. 2, the raft foundation: generally used for shear wall structure, we can learn the contents of the 04 g101-3 carefully, for example, son sinking raft of reinforced steel bar should be stretched out the edge of the LA (minimum anchorage length), and other aspects of some specific requirements. 3. Strip foundation: generally used for masonry structure. (ii) upper components: 1. Column: column reinforcement is relatively simple, only the longitudinal and stirrup. The longitudinal reinforcement of the top column is different from that of the column and column, and the anchor length of the column and the Angle column can be seen (03G101). The hoops should pay attention to the value of the length of the encryption area: the bottom post is encrypted = Hn / 3, the upper part of the column is encrypted length = Hn / 6, = 500, and also note that the column overlap should be encrypted. (of which, Hn refers to the column of the column on the floor) Liang: beam and steel shall be calculated according to 03G101. Beam is the upper tong long tendons, 支座负筋 (a row of 1/3 Ln, second quarter Ln, Ln is about two across larger values), bottom reinforcement generally per across to support both sides respectively into the anchor length is calculated. 3. Shear wall: the components in the shear wall must be fully calculated. Including: the distribution of wall reinforcement (horizontal reinforcing steel bar and the longitudinal reinforcement, pay attention to the wall and wall transition level of the reinforced by anchor, all kinds of Angle requirements are not the same), wing column

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档