建筑给排水毕业设计实习日志(Design internship log for water supply and drainage design).doc

建筑给排水毕业设计实习日志(Design internship log for water supply and drainage design).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑给排水毕业设计实习日志(Design internship log for water supply and drainage design) Design internship log for water supply and drainage design Wednesday, June 19, the weather is fine I went back to the dormitory last night and studied the drawing. I saw that I had been seeing more than eleven o clock, and I was full of drawings and fights when I went to bed. This is a technical extension project, the main content for building a factory self-provided power and chemical recovery project, size 36 unit project, the main factory building will commonly boiler room, transformer room, steam room, and connected to the coal gallery, chimneys, complex structure, high difficulty, is the core part of the project. In the construction project, there are also very simple bungalows, such as brick masonry structure of instrument maintenance workshop and steel structure dry coal shed. There are several underground reinforced concrete pools and two 45m (tall chimneys) one is reinforced concrete and the other is a brick chimney. Zhao said that the project should strive to win the bid. I would like to take part in this project after winning the bid, which is an excellent opportunity for me to study and exercise. Thinking about thinking, I became a hard hats, wearing overalls, standing on a scaffold, high quality checks of the builders practice, I find the scenery pleasing to both the toward the afar, suddenly blew a gust of wind, scaffolding and shake a few cast me into the air after I let out a cry woke up, it is a dream, just think back is full of cold sweat. Friday, June 21 the weather is cloudy Morning and zhao engineers go to paper mill site for field inspection. Zhao said, before compiling the construction organization design (plan), must go to the site to carry on the field inspection, must not be able to take for granted the door to build a car. Only after detailed understanding of the specific situation of the site, the design of the construction organization (plan) is not only targeted,

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档