建筑工程(Construction engineering)
Solar pv system installation and commissioning
Installation plan
The installation and construction plan of the new building photovoltaic system shall be included in the design and quality control procedures of the construction equipment installation and construction, and the corresponding installation construction plan and safety technical measures shall be developed. Both building the installation of a photovoltaic system construction should prepare the construction organization design and quality control procedures, and formulate corresponding installation construction scheme and safety technical measures, feasibility should be done when necessary.
Before installation of pv system, the following conditions shall be met:
The design documents are prepared and approved, and the system has been approved and filed by the relevant departments.
The construction organization design and construction plan has been approved;
Construction, site, power supply, roads and other conditions can meet the normal construction needs; The
The reserved pedestal, reserved hole, embedded parts, embedded pipe and related facilities meet the requirements of the design drawing and have been accepted.
Pv system installation construction flow and operation plan should choose easy construction, maintenance operation mode.
When installing the photovoltaic system, the protective measures should be taken for the finished products of the building, and the finished products shall not be damaged after installation.
Construction installers should take the following protective measures:
Wear insulating shoes, low-pressure insulating gloves, and insulated tools;
1. Construction sequence
Earthwork excavation - cushion layer - measuring release - bricklaying (casting of steel reinforcement - formwork installation - concrete casting) - cover plate installation
2. Earth excavation
The foundation adopts mechanical excavation, artificial bulldozing construction method, and mech
您可能关注的文档
- 物流作业(Logistics operation).doc
- 物质结构与性质知识点(Knowledge of material structure and nature).doc
- 狭水道追鱼(Chasing fish).doc
- 现代机房建设应用初探_机房360_中国绿_20140924_115656(The application of modern computer room in the construction of computer room 360_ China green _20140924_115656).doc
- 现代教育原理作业3(Modern education principle work 3).doc
- 现代日本人的生活习惯(Modern Japanese life habits).doc
- 现代经济学(425)考试大纲(Modern economics (425) syllabus).doc
- 现代设计史总结(Summary of modern design history).doc
- 现代师范教育发展方向的探讨(The development direction of modern normal education).doc
- 现代物料配送与高效仓储管理(鲁鹏)(Modern material distribution and efficient warehouse management (lu peng)).doc
文档评论(0)