建筑计量计价计算顺序(The order of building metering calculation).docVIP

建筑计量计价计算顺序(The order of building metering calculation).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑计量计价计算顺序(The order of building metering calculation) The calculation sequence of construction project cost (turn) is not busy calculation, see picture first: 1, general graph and the dividing building diagram have big contradiction; 2. There is no great contradiction between architecture and structure in single block diagram; 4. There is no big contradiction between the map and installation diagram; 3. There is no big contradiction between the detailed plan and the building and structure diagram; 4. Installation of floor plan and system diagram; If there is a big contradiction in the above issues, it will affect the cost. Send out your questions first; Otherwise, after a day of calculation, the figure cant be found. Second, the drawing is probably read, there is no big contradiction can start to calculate, if there is a big contradiction that part of the diagram avoids, good calculate first. Iii. Civil engineering calculation: 1. First step of construction area; 2. One structure -- building doors and Windows -- secondary structure -- metope -- floor, water, steps -- roof -- roof -- detail decoration. 3. Once a structure (mainly for beam and column awning), the data input is automatically calculated according to the established EXCEL form, and the sequence is from the ground to the ground, from the total to the point; It can be done in about a day or so, and it will be relatively easy to set up a form template and a concrete can produce data at the same time. Please check the details of the detailed drawings in the layout plan of each structure. Check the details of the calculation and make a clear drawing of the drawing, so as not to miss. The table can be used to obtain the data of floor area, beam side area and column area 4, doors and Windows statistics: according to the external walls, different thickness of the masonry and masonry material, window of door of different type and material form, as long as the input data can be concluded that the hole size, door

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档