- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程管理论文格式(Project management paper format)
Project management paper format
The design of construction organization is an important part of the design document of water conservancy and hydropower engineering. It is the main basis for compiling the budget of the project investment and the main reference basis for preparing the bidding documents. Therefore, it is very important to carefully construct the construction organization design, and to correctly determine the project cost and reduce the project investment, so as to control the project cost.
1. Influence of construction diversion design on project cost
1.1 selection of construction guide mode
The selection of the method of construction diversion shall comply with the principle of combining, utilizing permanent buildings and reducing the amount and investment of diversion works. For example, the vertical cofferdam can be used for permanent buildings such as the dam and guide wall, while the second and second vertical cofferdams are integrated. Plant high alert cofferdam: upper transverse cofferdams available heightening block sand hom to flood control elevation, the longitudinal cofferdam can use the guide wall pier, plant dam permanent buildings, such as the downstream transverse cofferdams extensions can use installment transverse cofferdams to flood control level. Tunnel diversion: can be combined with permanent diversion tunnel, but if it is a long tunnel, considering the long construction period is likely to affect the engineering benefit of the play, is unfavorable use permanent for the diversion tunnel.
1.2 construction diversion layout
Water resources and hydropower engineering construction diversion arrangement shall abide by the combined with the existing topography and geological and hydraulic conditions, construction site and into the road of the foundation pit, as far as possible to reduce the excavation, TianZhuLiang principle. For example, the diversion channel should be arranged on a wide platform
您可能关注的文档
- 巴氏奶与普通奶的区别(The difference between buttermilk and regular milk).doc
- 巴勒斯坦旅游旅行攻略(Travel guide to Palestine).doc
- 帮你认字(To help you read).doc
- 巴西ncm 号码(Brazil NCM number).doc
- 帮助我们祛湿的食物(Help us eat clearing damp).doc
- 布法罗旅游指南 (buffalo guide) - 纽约州出境游指南 yododo 游多多(Buffalo guide - New York state travel guide yododo Tours).doc
- 布料机在水泥混凝土路面摊铺施工中的应用_石磊(Application of cloth machine in cement concrete pavement paving construction).doc
- 布料基本知识(Fabric basics).doc
- 布鲁氏菌病防治技术规范(Technical specification for brucellosis).doc
- 布什在林肯号航空母舰上的讲话(Bush's speech on the uss Abraham Lincoln).doc
文档评论(0)