网站大量收购独家精品文档,联系QQ:2885784924

工程量清单及预算控制价评审的重难点及解决办法(The heavy and difficult problems and solutions of the inventory and budget control price review).doc

工程量清单及预算控制价评审的重难点及解决办法(The heavy and difficult problems and solutions of the inventory and budget control price review).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程量清单及预算控制价评审的重难点及解决办法(The heavy and difficult problems and solutions of the inventory and budget control price review) 1. The need for evaluation of project inventory Bill of quantities is the performance of the proposed project of the partial project, measures and other project name and corresponding number list, is an important part of the tender documents, is the main basis, whose budget control price, is the main basis of tender offer in bidding for construction, is part of the construction contract, and to adjust quantities, or review the pay project cost, completion settlement and solve the construction of the differences and disputes, claim. Therefore, it is necessary to review the bill of quantities in the assessment of the budget control price. If it is only to review the budget control price, it will be more than half done. Ii. Review of project inventory (a) review of the project code, project name, unit of measurement and quantity of works of the division project quantity list 1. According to the construction drawing and the valuation specification, the appendix and the selected project code are not correct; At the same time, the project code of the choice of project is consistent with the project name and measurement unit, and the project name in the quantity list is consistent with the project name of the construction drawing; For the items in the pricing specification, the items selected in this list are in accordance with the calculation of the amount of engineering. And so on. 2. Reasonably divide the project name, check for missing items, multi-column or duplicate list items. According to the price specification, technical specification, standard atlas, construction drawing, engineering structure, construction site and materials and specifications, the project name shall be reasonably divided. In general, the basic bedding is single column; For the complex roof of the method, the insulation, waterproof and the decorative surface of the block are a

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档