- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
华侨城用电设计(Overseas Chinese city electricity design)
This article is contributed by the net fish
Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view.
The design of the first phase of zhonghai overseas Chinese city
Orders,
record
1) make the basis of STH. One, two, site exploration records...... A brief introduction to the construction of temporary electrical equipment. Choose the total load of transformer capacity. 3. Determine the location and route of power supply, total distribution box, distribution box, etc. ......... 6. Wire section calculation and electrical type, specification... ........................ To develop safety and electrical measures and electrical fire prevention measures. ............ Draw the electrical plan, the system (according to the line)... 10
0
The design of the first phase of zhonghai overseas Chinese city
A, 1, compilation basis provided by the China real estate (fujian) co., LTD. Zhuhai city architectural design institute of China · oct issue engineering design and construction drawings and documents, as well as the survey site geotechnical engineering geological report. 2. Fuzhou sanqiao construction engineering co., LTD. And zhonghai real estate (fujian) co., LTD. Have signed the construction contract of zhonghai huayi city phase I project. 3. Construction manual, current construction specifications, electrical design specifications. 4. General design of the construction organization of the first phase of China shipping China. Second, field exploration records project name Construction site structure mass type current transformer capacity, China shipping oct issue, (1 # 2 # 3 # # # # # 9 10 11 15 floor) pingtan county city longshan district frame, frame shear wall 110345.6 m2, building area of 1600 kva equipment protection system TN - C - S
Project summary
1. The power supply for the construction site shall be supplied by party a (intro
您可能关注的文档
- 安规试题(Safety tests).doc
- 安全交底(Security clarificaiton).doc
- 安全教育演讲的事例(The example of safe education speech).doc
- 安全生产和设备管理(Safety production and equipment management).doc
- 安全生产管理制度(一)(Safety production management system (1)).doc
- 安全生产技术综合模拟题一(Comprehensive simulation of safety production technology 1).doc
- 安全生产科【2011】第十五期(Safety production department [2011] 15th).doc
- 安全生产知识和hse相关知识(Knowledge of safe production and hse related knowledge).doc
- 安全施工规范(Safety construction specification).doc
- 安全使用氧气注意事项(Precautions for safe use of oxygen).doc
- 2024年重庆工业职业技术学院招聘笔试真题及参考答案详解一套.docx
- 2024年湖南司法警官职业学院招聘笔试真题及参考答案详解1套.docx
- 2024年贵州健康职业学院招聘笔试真题及参考答案详解.docx
- 2024年湖南司法警官职业学院招聘笔试真题参考答案详解.docx
- 2024河北交通职业技术学院招聘笔试真题附答案详解.docx
- 2024年郴州思科职业学院招聘笔试真题及参考答案详解一套.docx
- 2024新疆师范高等专科学校招聘笔试真题及参考答案详解1套.docx
- 2024年郑州工业应用技术学院招聘笔试真题及完整答案详解1套.docx
- 2024年辽宁经济职业技术学院招聘笔试真题及答案详解1套.docx
- 2024年浙江树人大学招聘笔试真题及答案详解一套.docx
文档评论(0)